Laserfiche WebLink
May 15, 2023 <br />1^ Floor Walls: <br />❑ Front P2-2 Shear Wall (Unit B and Unit C) <br />o Edge Nailing and Sheathing Splices: <br />Note: (5) Instants of not sough nai ing observed. Spacing-4" O.0 <br />Builder has been notified and provided picna es ofresoludoN Construction romntrms to <br />plan set <br />o Plate Nailing and Ftaming Ceps as speufied on plans: Construction mMomes mpl .set <br />o Mchorboltspacing Coasmrcean cmyormaropGn eer <br />Give me a call if you have my questions or comments. N T. <br />Sincerely, d ill <br />Dane Pollett <br />= Engineering <br />s� <br />• Page 2 <br />