Laserfiche WebLink
• <br /> 467 Swan Ave • Hohenwald,TN 38462 • (800) 284-7437 • www.olivertechnologies.com • Fax (931) 796-8811 <br /> Installation Instructions for 1100 "V" Series MI Steel Foundation System <br /> SPECIAL CIRCUMSTANCES: if following conditions occur-STOP! Contact Oliver Technologies at 1-800-284-7437 far further instructions <br /> a) Pier(system)height exceeds 48' b) Roof eaves exceed 16' c) Roof pitch greater than 7/12 d) Location is within 1500 feet of coastline <br /> e) Soil conditions less than 48 f) Thick and wide I Beam attachments are available. <br /> INSTALLATION OF GROUND PAN FOR DIRT SET (IV) <br /> 1) Remove weeds and debris in an approximate three foot square to expose firm, level undisturbed soil or controlled fill for each ground pan The <br /> 1100 V Pan is equivalent to a 21 x 21 footing Top of ground pan(C)must be installed at ground level or per local jurisdiction. <br /> 2) Place center ground pan (C)directly below chassis I-beam Press or drive pan completely into soil until flush with or below soil <br /> SPECIAL NOTE The longitudinal"V"brace system serves es a pier under the home and snould be loaded as any other pier. It is recommended that <br /> after leveling piers,and ohe-half inch (1/2')before home is lowered completely onto piers,complete items 3 through 7 below <br /> INSTALLATION OF LONGITUDINAL"V'BRACE SYSTEM <br /> 3) Select the correct square tube brace(E)length for set-up (pier)height at support location <br /> PIER HEIGHT 1 5' <br /> (Ppprex 40-60 degrees Max.) Tube Length <br /> 14" to 18" 20" T <br /> 18" to 25" 28' 0.75' <br /> 24"to 35' 39' {l+ <br /> 30" to 40" 44' <br /> 36" to 48" 54" Part E <br /> PIER HEIGHT=the 'rers ee frcr lee'cp of,fie pan <br /> to the bottom of the I-Seem 0 75'.] <br /> 0l16"Dia (562")hale <br /> 4) Install both of the 1 5'square tubes(E)into the"V"bracket (J), insert carriage bolt and leave nut loose for final adjustment <br /> 5) Place I-beam connector(F)loosely on the bottom flange of the I-beam <br /> 6) Attach the selected 1.5"tubes(E)to the I-beam connectors(F)and fasten loosely with bolts and nuts NOTE. The ground pan must be level in <br /> both directions to ensure the angle markings on the center point connector are correct from the honzontal plane of the pan. The angle is not to <br /> exceed 60 degrees and not less than 40 degrees The"V'bracket(J)is stamped with the angles to verify correct degree. Use proper length tube <br /> or cut and drill tube to achieve proper length. (The tube may be cut using any appropriate steel cutting method such as steel saw, cutting torch, <br /> etc. New holes must be drilled to the dimension and at the location as shown for part (E) <br /> 7) Using standard hand tools, tighten all nuts and bolts. When connecting the brace tube to the model 1100-10-P I-beam connector bracket, tighten <br /> at least one and a half to two full turns past hand tight <br /> INSTALLATION OF(LATERAL)TELESCOPING TRANSVERSE ARM SYSTEM (1100 ITV) <br /> 8) Select the correct transverse arm(H).The 60"sections are standard.The 72"sections are used on frame widths greater than 99.5". <br /> 9) Install the 1.5'transverse brace(H)to the ground pan connector(D)with the bolt and nut. <br /> 10) Slide 1.25-transverse brace into the 1 5'brace and attach to adjacent I-beam connector(I)with bolt and nut. <br /> 11) Secure 1.5'transverse arm to 1 25"transverse arm using four(4)1'4'- 14 x 3/4" self-tapping screws in pre-drilled pilot holes <br /> INSTALLATION USING CONCRETE (ICV) <br /> The concrete footer,runner or slab may be of any shape,that has a minimum of 2900 cu.in.,with a minimum depth of 3 5'(dry set)or 6"(wet set).at <br /> each system location The surface of the footing shall be large enough to support the pier load and allow at least 4'from the concrete bolt to the edge <br /> of the concrete(le. 22'x22'x6"footer).The concrete shall be a minimum of 2500 psi mix(ore-blended sacked concrete mix is acceptable).Special <br /> ,ospect!on of footing is not required If the 1100 ITC transverse system. (D CAI or D)bracket only)is to be installed without the use of the 1100 ILC(`I) <br /> longitudinal system (J(N/or D) bracket),it MUST be installed within 18"of pier <br /> NOTE The bottom of all footings,pads,slabs and runners must be per local jursidiction. <br /> LONGITUDINAL(V) <br /> When using the 1100 wet set u(W)bracket, simply install the bracket in runnerofooter OR when installing in cured concrete,use the 1100 dry set J(D) <br /> bracket.The 1100 dry sat J(D)bracket is attached to the concrete using(2)1/2'X 3"concrete wedge bolts Place the bracket in desired location Mark <br /> bolt hole locations, then using a 12"masonry bit, drill a hole to a minimum depth of 3' Be sure all dust is blown out of the holes.Place wedge bolts into <br /> drilled holes then place 1100 J(D)bracket onto wedge bolts and start wedge bait nuts Take a hammer and lightly drive the wedge bolts down by hitting <br /> the nut(Do not hit the top of threads on bolt). Complete by tightening the nuts. <br /> LATERAL(Transverse Arm) <br /> For wet set installation set the transverse connector bracket DtW)into runner-it-cater at desired location For dry set installations, the transverse connector <br /> bracket 0(D)is attacnedto the concrete using(2) 12'X 3 concrete wedge bolts Mark bolt hole locations.then using a 1/2"masonry bit. drill a hole to a <br /> minimum depth of 3' Be sure all dust is blown out of the holes.Place wedge bolts into drilled holes then place transverse connector oracket J(D)bracket <br /> onto wedge boits and start wedge bolt nuts Take a hammer and lightly drive the weage bolts down by hitting the nut(Do not hit the top of lhersts on <br /> oat Complete by tightening the nuts <br /> 4.i•itsedJi I 11 PATENT :` 6634150 and other patents pending -ri Pr.7c2 3 <br />