Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 11/2/2023 <br />City of Everett Permit Services Public Works Permit #: PW2311-005 <br />3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br />EV E R E T T Everett, WA 98201 Planning Reference #: <br />everettwa.gov/permits Public Works Fee: $130.66 <br />WASHINGTON Perm itSeryices@eyerettwa.goy Schedule Inspections at: onlinepermits.everettwa.gov <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />FOSHEIM GENE R & SUSAN D Jonathan Herrera <br />2426 HARRISON AVE 8423 Mukilteo Speedway, 101 <br />EVERETT, WA 982013348 Mukilteo, WA 98275 <br />PHONE: 4256261877 PHONE: 4256261877 <br />SITE ADDRESS: 2426 HARRISON AVE TAX PARCEL ID #: 00516853402900 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: Demolition and replacement of city concrete sidewalk <br />NOTES: Excavate and Remove Approx 185 SOFT of existing concrete sidewalk up to 4" in depth. Remove tree roots. Haul away. Pay dump fees. <br />Install and compact new gravel base 2"-3" thick. Set forms for new concrete sidewalk, Supply and pour concrete 4" thick commercial grade 4000 <br />PSI tooled joints, broom finish Approx 185 SQFT <br />PERMIT CONDITIONS: <br />1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov. Available inspection dates are shown in the dropdown menu. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and Specifications for <br />Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department. Approved plans must remain on job -site at all times. <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally request <br />all required inspections. <br />6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br />SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br />7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br />8. Protect all existing underground utilities during construction. <br />9. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per City Standards and/or as directed by the City PW Inspector. <br />10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on -site in a <br />manner that does not adversely affect neighboring properties, including the City's right-of-way and/or easements and the improvements located <br />therein. <br />11. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting PW 25- <br />Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br />12. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever requires use of the right- <br />of-way for municipal purposes. <br />PERMIT FEE BREAKDOWN: <br />Paving (171 SF).......................................................................$45.00 <br />PW Plan Review......................................................................$20.00 <br />PW Site Inspection.................................................................$20.00 <br />Stormwater System Development Fee (171SF) .....................$45.66 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and <br />all claims for damages, costs, expenses, or causes of action that may arise because of installation and maintenance of the improvement or other <br />right-of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged <br />thereby. <br />VALIDITY/EXPIRATION: <br />Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion. <br />This permit may be canceled by the city upon any stoppage of work on this project over 180-day duration. Each inspection extends the expiration <br />date 180 days to keep the permit open while work is active. <br />Page 1 of 1 <br />_APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />