Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 10/21/2022 10/21/2022 ELEC 06-ROUGH IN MICHAEL APPROVAL eTRAKiT Inspection Request <br /> WICKLANDER <br /> Notes: <br /> 10/19/2022 11:36 AM Sarah Monroe <br /> Ceiling cover.Please call with ETA <br /> Contact Name:Jeremiah Dahl <br /> Site Address:10025 19TH AVE SE UNIT 201 <br /> Phone:4259717987 <br /> e-Mail:sarah@lunstrumelectric.com <br /> Verified that corrections were made.Receptacles changed to tamper resistant in waiting room and reception area.exam room one receptacle changed <br /> out and all are functioning.All low voltage cabling is supported off the grid and supported per NEC. <br /> corrected to approved cover-needs to be finaled <br /> 10/24/2022 10/24/2022 1 ELEC 10-FINAL MICHAEL JAPPRVD-PERMIT I CHANGED TO FINAL <br /> WICKLANDER FINAL <br /> Notes: <br /> 10/21/2022 3:53:56 PM(MICHAEL WICKLANDER) <br /> Verified that corrections were made.Receptacles changed to tamper resistant in waiting room and reception area.exam room one receptacle changed <br /> out and all are functioning. <br /> All low voltage cabling is supported off the grid and supported per NEC. <br /> Submit Delete Note <br /> 10/24/2022 9:10:13 AM(MICHAEL WICKLANDER) <br /> corrected to approved cover-needs to be finaled <br /> I <br /> Printed: Friday, 16 December, 2022 3 of 3 <br /> SUPERION <br />