Laserfiche WebLink
Apri120,2023 <br />1^ Floor Walls: <br />❑ Front P2-2 Shear Wall (Unit B and Unit C) <br />o Edge Nailing and Sheaddng Splices: <br />Note: (5) Instance of only a sv Wle row of nailing on P2-2 walls observed. <br />Builder Ims been notified and provided pictures ofrewdudoN Coneo-ucriov ronforats to <br />plan set <br />o Plate Nailing and Puna; Clips as speufled on plans Consauctian mMonns tap/ .set <br />o Mchorboltspacing: Coasmrcemr coMa(marop/an eer <br />Give me a call if you have any questions or comments. N T. <br />Sincerely, d ill <br />Dane Pollett <br />= Engineering <br />r� <br />• Page 2 <br />