My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/12/20 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/12/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2023 8:45:47 AM
Creation date
12/26/2023 8:42:00 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City Council Agenda Item Cover Sheet <br /> <br />Project title: Amendment No. 2 to the Professional Services Agreement with BHC Consultants to extend the contract <br />term through 12/31/2024 for engineering services during construction. <br />Council Bill # interoffice use Consideration: Amendment #2 to Professional Services Agreement <br />Project: WPCF TFI Bar Screen Upgrades <br />Partner/Supplier: BHC Consultants <br /> Location: Water Pollution Control Facility <br />Preceding action: Contract Amendment for Design and Construction Services <br />Fund: 336 – Water & Sewer System Improvements Fund <br />Agenda dates requested: <br />12/20/2023 <br />Briefing <br />Proposed action <br />Consent X <br />Action <br />Ordinance <br />Public hearing <br />Yes x No <br />Budget amendment: <br />Yes x No <br />PowerPoint presentation: <br />Yes x No <br />Attachments: <br />Professional Services <br />Agreement Amendment <br />Department(s) involved: <br />Public Works, Legal <br />Contact person: <br />Souheil Nasr <br />Phone number: <br />425.257.7210 <br />Email: <br />snasr@everettwa.gov <br />Initialed by: <br />RLS <br />Department head <br />Administration <br />Council President <br />Fiscal summary statement: <br />No fiscal impact. Total contract amount unchanged. <br />Project summary statement: <br />Public Works seeks to amend a Professional Services Agreement with BHC Consultants <br />for the WPCF TFI Bar Screen Upgrades project. The original PSA was approved on <br />January 5, 2022 and amended on August 10, 2022 to include full project design, <br />permitting assistance, and engineering services during construction. Construction of the <br />project will be extending into the spring of 2024. <br />Recommendation (exact action requested of Council): <br />Authorize the Mayor to sign Amendment No. 2 to the Professional Services Agreement <br />with BHC Consultants to extend the contract term through 12/31/2024 for services <br />during construction.
The URL can be used to link to this page
Your browser does not support the video tag.