Laserfiche WebLink
LANCE MUELLER & ASSOCIATES <br />A R C H ! T E C T S A i A <br />February 13, 2023 <br />Drew Martin <br />Plans Examiner <br />Everett Permit Services <br />3200 Cedar Street <br />Everett, WA 98201 <br />RE: Foremost Fuji Storage mezzanine <br />1 sc review response <br />Permit Number: B2301-011 <br />Dear Drew, <br />FEB 15 2023 <br />CITY pF <br />Permit SeVvIResTT <br />I have reviewed your review 1 correction letter dated February 3, 2023. <br />In my response letter below, I have provided a response to the architectural comment on your <br />review letter along with narrative for minor plans revisions added since the permit plans were <br />submitted. I do not include comments on structural revisions as they will be under separate letter <br />by Engineers Northwest. Below I have listed the sheet number and narrative for clouded revisions <br />made to the drawings. <br />TA1.0 <br />1. Per your architectural review comment number 1, 1 have added "DESIGN TEAM REVIEW" <br />below the index of drawings where I stipulate the design team will review metal stairs and guardrail <br />at the mezzanine edge. <br />2. Added "(UNDER SEPARATE PERMIT)" to deferred submittals on deferred submittal list. <br />J, <br />TA2.1 l � ,- ,�'- d� « r��Q�; ��,�F,� ; �� �=r_ rl' 1 -1-,F r^ , <br />/1. Egress: The second egress from the mezzanine is part of the phase II work and will be in <br />place prior to use of the storage mezzanine. <br />/ 2. Accessibility: The phase II addition will provide a connection between the phase I storage <br />,mezzanine and Phase II warehouse space that provides level access to an elevator and accessible <br />entrance to the building. <br />TA3.0 <br />1. Detail 17/TA3.0 has been revised. See structural has been removed from note on guardrail <br />attachment. Rail attachment will be part of Design Team Review. <br />130 Lakeside Suite 250 Seattle, WA 98122 (206) 325-2553 Fax (206) 328-0554 <br />Architecture Planning Space Planning Interiors /, <br />