My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
905 80TH ST SW FORMOST FUJI 2024-10-07
>
Address Records
>
80TH ST SW
>
905
>
FORMOST FUJI
>
905 80TH ST SW FORMOST FUJI 2024-10-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2024 12:02:02 PM
Creation date
12/26/2023 11:24:08 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
905
Tenant Name
FORMOST FUJI
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Report # k <br />INSPECTION REPORT FFM us oazoz3 NFL' <br />PR0)=NA <br />DATE <br />PAGE <br />Formwt Pu'i Meznnine <br />04-20-23 <br />1 of 2 <br />PR <br />rD <br />aue.oworPasDrNo. <br />St <br />905 9W St. SW, Everettt W 98203 <br />096.23174 <br />WT <br />FABRICATIONFACD.ITY <br />Kraan <br />Melds Fabrication Co. INC <br />csNEaAL coN3RACTORrsareaMTFNDENT <br />EDBcoNrRAcromFORFwuN <br />Metals Fabrication Co. INC /Mike Ha w <br />g+srecrwN rreE-(sZ[cpvFxACE_ cx.a-pp..�.wre... <br />>1_----- <br />❑Wddiagntinu SNDT Tevlieg ❑N/A <br />LOCATTON OF WSPBCDON: Spo4aoq WA <br />❑Patinaeas Elm®IiT <br />❑Pniadic ❑PT ❑VT <br />DISPELTION AEQUBSfRDBY: Krvaee/MFC <br />ame.: rmr <br />CODES AND SPECIPICATTONS <br />.... ._._.....--- _................_------------........_..___ <br />REFEMNCF DRAWINGS AND/OR SPECMFl TIOM <br />.._.........._..__._...................... <br />AWS <br />.-------------- <br />Shop Drawings <br />Dl.a 0 DI3 <br />SDI.t ❑OWc <br />2020 <br />WMDMOPR0c9SS: <br />E=TRODBTYPB: <br />13S1aAW SFCAW QGMAW ❑mAW ❑Oliam <br />E71T-1 <br />WMI ER(S)NAtAES: <br />On file With Metal Fabrication Co. INC <br />MSPECIIONDETAILS: <br />Arrived on Shia at Metals Fabrication Co. INC in Spokane WA to perform NDT on the Formost Fuji <br />Mezzanine project as requested by Krazan and MFC. <br />Met with NYC to review the inspection details. NYC has 2 structural steel members which requires <br />Ultrasonic Testing (UT). <br />Performed 100% UT on 2 structural steel members. All UT was found acceptable. See UT report on page <br />2. <br />Unless otherwise noted, to the best of my knowledge all fabrication inspected was found to be acceptable as <br />per the 2020 AWN Dl.l Structural Steel Welding Code Clause 8, Table 8.1 and or Table 8.2. <br />Nan o s nngiena: None <br />MSPECTOR'S SIGNATURE <br />PRMTED NAME <br />-� <br />Daniel Sturgis <br />REVBWEDBY <br />DATE <br />04-20-23 <br />aXARC, sm. <br />dp�w'�P 9nn <br />phm5WN5-'IM T mN]/165;p55 <br />F=5095M'Ww - rharepn not not be rrymdwK ar in all, w Jsna gnsn pn,,ni dOXARe, Re, R,"05119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.