My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1018 91ST PL SW 2023-12-26
>
Address Records
>
91ST PL SW
>
1018
>
1018 91ST PL SW 2023-12-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2023 3:50:18 PM
Creation date
12/26/2023 3:42:52 PM
Metadata
Fields
Template:
Address Document
Street Name
91ST PL SW
Street Number
1018
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
First, I need clarification on the contractor performing the work. On the demolition permit, we have <br />contractor SMK Construction with license number SMKCOC'784M7. On your recent utility permit <br />application, we have contractor 1DX Excavation with license JDXEXE•782P7. In the details of both <br />permits, we have owner listed as contractor. If there is a contractor for this work, then we will <br />require their WA state contractor's license number and their City of Everett business license <br />number. Otherwise, if the homeowner is performing the work themselves, please let me know and I <br />can update the application. <br />With regards to utility permit U2211-049, I have marked that permit as "Denied" due to your <br />property being outside of City of Everett sewer limits. The property is connected to the Mukilteo <br />Water and Wastewater District so you will need to contact them for sewer requirements. <br />Lastly, in your demolition permit application, you indicated that the property is connected to <br />electricity. In order to process your demolition permit, we will require you to apply for an electrical <br />permit for disconnect. This permit can be applied for and obtained online. Please note, if you are the <br />homeowner performing this work, you will need to complete our homeowner affidavit and include it <br />with your electrical permit application. Here is a link to the affidavit: <br />Otherwise, the electrical permit will need to be obtained by a licensed electrical contractor. <br />If you have any questions, please let me know and I'll be happy to help. <br />Take care, <br />Audrey Arbow )she/her) <br />to Permit Technician I Permit Services <br />425.257.8810 I3200 Cedar Street, 2nd Floor, Everett, WA 98201 <br />o `Phone Hours: M-F:8 a.m.-12 p.m&lp.m.-3 p.m. <br />EVERETTo <br />�� ecebook I TwittEt <br />everettwa.eov/oermits F <br />Note: Entails and attachments sent to and hom the City of Everett are public records and may be subject to disclosure <br />pursuant to the Public Records Act. <br />
The URL can be used to link to this page
Your browser does not support the video tag.