Laserfiche WebLink
1 <br />I <br />Start Here <br />Does the site have 35% <br />or more of existing <br />impervious coverage? <br />Does the project result in <br />5,000 square feet, or <br />greater, of new plus <br />replaced hard surface <br />area? <br />Yes <br />Yes <br />See Redevelopment Minimum <br />Requirements and Flow Chart <br />(Figure 1-2.4.2). <br />Does the project convert 3/4 <br />acres or more of vegetation to <br />lawn or landscaped areas, or <br />0 convert 2.5 acres or more of <br />-- native vegetation to pasture? <br />Yes <br />s <br />All Minimum Requirements <br />apply to the new and replaced <br />hard surfaces and converted <br />vegetation areas. Yes <br />Minimum Requirements #1 <br />through #5 apply to the new Yes <br />and replaced hard surfaces <br />and the land disturbed. <br />in <br />Does the project result in 2,000 <br />square feet, or greater, of new plus <br />replaced hard surface area? <br />Does the project have land <br />disturbing activities of 7,000 <br />square feet or greater? <br />No <br />Minimum Requirement #2 <br />applies. <br />r, Figure 1-2.4.1 <br />Flow Chart for Determining Requirements for <br />New Development <br />DEPARTMENT OF Revised June 2015 <br />ECOLOGYPlease see http l%www.ecy.wa.gov/copyright html for copyright notice including permissions, <br />State of Washington limitation of liability, and disclaimer. <br />