Laserfiche WebLink
C. Restoration Requirements <br /> 1. Trenches and Multiple Window Cuts. The restoration of trenches and multiple <br /> window cuts shall be as follows, provided that single window cuts made by more <br /> than one Utility Purveyor that are associated with a private development project <br /> will be considered multiple window cuts for restoration purposes: <br /> i. All trench backfill shall be per WSDOT/APWA Specification 7-08.3(3) and <br /> these Standards, using bank run gravel or CSTC conforming to <br /> Specifications 9-03.19 or 9-03.9(3), respectively. Backfill shall be placed to <br /> the bottom edge of the existing asphalt or within 6-inches of existing road <br /> grade, whichever is greater, in successive layers not exceeding 6 inches in <br /> loose thickness. Each layer shall be compacted with mechanical tampers <br /> to 95 percent of maximum density as determined in ASTM D1557. <br /> Verification of backfill compaction shall be required and shall bear the stamp <br /> and signature of a professional engineer licensed in the State of <br /> Washington. The verification of backfill compaction test shall be submitted <br /> to the County prior to the placement of the overlay required by EDDS <br /> Section 8-05.C.i.iii below. <br /> ii. After placing a tack coat on the existing asphalt edges, the final patch shall <br /> be constructed with 6-inches of compacted HMA placed in the trench cut <br /> up to finished grade per WSDOT Standard Specifications Division 5-04. <br /> iii. After the backfill compaction has been verified and placement of the <br /> compacted HMA final patch, a full-width overlay consisting of 2-inches of <br /> compacted HMA shall be placed per WSDOT Standard Specifications Section <br /> 5-04. In preparation for overlaying an existing asphalt road, the ends of <br /> the overlay project and any areas where matching existing curb or <br /> pavement will be necessary shall be planed in accordance with Standard <br /> Drawing 4-165. Should the final patch not be of satisfactory surface texture <br /> and grade, an asphalt pre-level shall immediately be done to ensure a <br /> smooth driving surface during the period before the final asphalt overlay. <br /> iv. Full-Width Overlay Limits for a Single Lateral Trench <br /> The full-width overlay limits for a single lateral trench extend laterally from <br /> the curb line or edge of pavement to curb line or edge of pavement and <br /> longitudinally along the roadway from 10 feet before the first pavement cut <br /> line of the trench to 10 feet beyond the last pavement cut line of the trench <br /> as illustrated in Figure 8 - 1. <br /> 8-6 Engineering Design and Development Standards <br /> September 17, 2021 <br />