My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1730 100TH ST SW 2023-12-29
>
Address Records
>
100TH ST SW
>
1730
>
1730 100TH ST SW 2023-12-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 1:52:00 PM
Creation date
12/27/2023 8:44:54 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
1730
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To meet these requirements, a Construction Stornwater Pollution Prevention Plan (S WPPP) has <br />been provided. The following addresses Minimum Requirements 1 to 5: <br />Minimum Requirement#l: Preparation ofstormwater site plan <br />A Stormwater Site Plan/Building Site Plan has been prepared. <br />Minimum Requirement #2: Stormwater Pollution Prevention Plans (SWPPP) <br />SWPPP drawings and the required elements have been prepared and are a stand-alone <br />document from this report. The BMPs indicated on the plans will be implemented during <br />construction. Additional BMPs may be used on the site depending upon weather <br />conditions. <br />Minimum Requirement #3: Source Control of Pollution <br />During construction S WPPP BMPs will be implemented, based on SMMW W Volume IV, <br />Chapter 5, as shown on the SWPP plans. This project is not required to have source control <br />BMPs after construction is completed. <br />Minimum Reguirement#4: Preservation of natural drainage and outfalls <br />The proposed site development is not expected to have off -site drainage impacts. This <br />project will disperse stormwater runoff from the natural drainage location. On -site BMPs <br />will he used to mitigate potential erosion issues and control runoff. For more information <br />about BMP details and placement please refer to Section I of this report and Site Plans <br />associated with this project. <br />Minimum Requirement #5: On -site Stormwater Management <br />The proposed project triggers Minimum Requirements l through 5; therefore, the proposed <br />project will use BMPs from List #1 of SMMWW Volume I, Table 1-3.2 to mitigate <br />storrowater runoff. <br />BMPs for Lawn and Landscaped Areas: <br />• BMP T5.13: Post -Construction Soil Quality and Depth is feasible. Existing topsoil <br />will be stockpiled and used for final stabilization. <br />BMPs for Roofs: <br />• BMP T5.30: Full Dispersion is not feasible due the lack of 100 ft minimum flow <br />path. <br />• BMP T5.10A: Downspout Full Infiltration System isnotfeasibleduetothe shallow <br />depth to water table. <br />• BMP T730: Bioretention is not feasible due to the shallow depth to water table. <br />
The URL can be used to link to this page
Your browser does not support the video tag.