Jessica Jarvi <br />From: Jessica Jarvi <br />Sent: Friday, September 23, 2022 1:36 PM <br />To: Pavel Andreyanov <br />Cc: Planning Email; 'MACENGINEERING@FRONTIER.COM' <br />Subject: 10033 Dakota Way - Planning Comments and Corrections - Building and Public Works <br />Permits <br />Hello, <br />Thank you for submitting building permit applications for the proposed work at 10033 Dakota Way, permit numbers: <br />B2207-083, B2207-086, B2207-089, B2207-90, B2207-091, and B2207-092. I am the planner conducting the review for <br />these applications; please note the following comments are not a thorough plan check review and they only address <br />larger zoning compliance points and the submittal checklist. Additional comments may also be provided by other <br />Departmental reviewers for your application; please utilize the Online Permitting Portal to check on the status of other <br />reviewers. <br />Planning cannot further review and/or approve your permit until the following revisions have been addressed: <br />Building Height: Building height calculations must be provided on the site plan and on, at minimum, one <br />elevation drawing in accordance with EMC 19.22 and the building height handout. Please review and revise <br />accordingly. <br />Driveways: There are some concerns regarding the 2ft 'transition zone' adjacent to the proposed driveways. It is <br />stated in EMC 19.34.110 that "For nonalley access lots, the maximum driveway width within the front or street <br />side setback shall not exceed thirty feet, or fifty percent of the lot frontage width, whichever is less." As it is <br />currently shown, the widths of the paved (asphalt) driveways add up to the total maximum driveway width and <br />it is unclear from the information provided why the additional transition zones are necessary nor why they <br />extend the entire length of the drive out to the street. Please clarify for staff to assess and/or remove the <br />transition zones entirely from the front setback so as not to count against your maximum driveway width. <br />For reference, the residential construction submittal checklist is available online and includes the residential site plan <br />checklist and building height handout. Re -submittal instructions are outlined here; please submit at minimum 2 copies <br />of the revised sheets/site plans unless corrections have or are requested by other reviewers warranting complete <br />resubmittal of the plan sets. If you have any Planning related questions, please contact me directly via email or the <br />Planner On -Duty at Planning@everettwa.gov. The Unified Development Code is available online, here: <br />https://everett.municipal.codes/EMC/19. <br />These comments are only related to the land use code and do not account for all possible requirements from other <br />departments. Additional comments may be provided by other reviewers for your application; please utilize the Online <br />Permitting Portal to check on the status of other reviewers. For general permit questions, please contact Permit Services <br />at PermitServices@everettwa.gov or 425.257.8810. In the meantime this permit application is on hold for further <br />Planning review until the requested revisions have been received demonstrating compliance with the code and <br />submittal checklists. Additional comments or corrections may be required upon review of the requested information. <br />Best Regards, <br />- Jessica Jarvi <br />Assistant Planner I Planning Division <br />Community, Planning, and Economic Development Department <br />EVERETT 425.257.8976 12930 Wetmore Avenue, Suite 8A, Everett, WA 98201 <br />everettwa.gov/planning I Facebook I Twitter <br />