My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3370-14
>
Ordinances
>
Ordinance 3370-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2014 1:51:29 PM
Creation date
3/19/2014 1:51:26 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3370-14
Date
3/5/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
data if it is derived through statistically reliable methodologies. Information must <br /> be consistent with Office of Financial Management (OFM) population forecasts. <br /> Student generation rates must be independently calculated by each school district. <br /> The CFP must comply with Chapter 36.70A RCW (the Growth Management <br /> Act). <br /> The methodology used to calculate impact fees must comply with Chapter 82.02 <br /> RCW. The CFP must identify alternative funding sources in the event that impact <br /> fees are not available due to action by the state, county or cities within the <br /> District. <br /> When the County adopted its School Impact Fee Ordinance in November 1997, it established the <br /> specific criteria for the adoption of a CFP and the assessment of impact fees in the County. <br /> Section 3 of the Ordinance defines the requirements for the biennial CFP updates. Table 1 of the <br /> Ordinance outlines the formulae for determination of impact fees. <br /> Overview of the Mukilteo School District <br /> Twenty-six square miles in area, the District encompasses the City of Mukilteo, portions of the <br /> City of Everett, and portions of unincorporated Snohomish County. The Mukilteo School District <br /> is bordered by the Everett School District to the north and the east and the Edmonds School <br /> District to the south. <br /> The District serves a student population headcount of 14575 (October 2011) with eleven <br /> elementary schools (grades K-5), four middle schools (grades 6-8), two comprehensive high <br /> schools (grades 9-12), and one alternative high school (grades 9-12). For the purposes of facility <br /> planning, this CFP considers grades K-5 as elementary, grades 6-8 as middle school, and grades <br /> 9-12 as high school. For purposes of this CFP, enrollment in the Sno-Isle Skills Center is not <br /> included. <br /> The most significant issues facing the District in terms of providing classroom capacity to <br /> accommodate existing and projected demands are: <br /> Facility shortfalls currently exist at elementary and high schools. Middle schools show <br /> deficiencies beginning in 2012. <br /> Uneven growth rates exist between geographic sectors within the District. Such <br /> uneven growth patterns imply that some schools will reach maximum capacity sooner <br /> than others and this will increase the difficulty of maintaining stable school <br /> boundaries. As well, school choice is required by federal and state regulations. <br /> Students attending Title 1 funded schools in improvement may choose to attend <br /> schools which are not in improvement. The resulting shift in demographics may cause <br /> the receiving schools to reach capacity more quickly than anticipated and conversely, <br /> the sending Title 1 schools may reach their capacities later than anticipated. The future <br /> of federal choice regulations is uncertain at the writing of this plan, but regardless,the <br /> District will need to continue to transfer students from high population centers to <br /> schools with capacity until new facilities are built to absorb growth. <br /> These issues are addressed in greater detail in this CFP. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.