My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3370-14
>
Ordinances
>
Ordinance 3370-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2014 1:51:29 PM
Creation date
3/19/2014 1:51:26 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3370-14
Date
3/5/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Facility Design Capacity-number of students each planned improvement is designed to <br /> accommodate. <br /> 4. Student Factor - average number of students generated by each housing type -- in this <br /> case, single family dwellings and multi-family dwellings. The District conducted <br /> student generation studies within the District. This was done to "localize" generation <br /> rates for purposes of calculating impact fees. Student generation rates for the District are <br /> shown on Table 12. <br /> Table 12 -Student Generation Rates2 <br /> Middle High <br /> Unit Type Elementary School School TOTAL <br /> Single Family 0.246 0.112 0.133 0.491 <br /> Multi-Family(2+ Bedrooms) 0.193 0.084 0.112 0.3902 <br /> School Construction Cost Variables <br /> 1. Current Facility Square Footage-used in combination with the"Existing Relocatable <br /> Square Footage"to apportion the impact fee amounts between permanent and interim <br /> capacity figures. <br /> 2. Estimated Facility Construction Cost -based on planned costs or on actual costs of <br /> recently constructed schools. The facility cost is the total cost for construction projects as <br /> defined in Table 11. Facility construction costs also include the off-site development <br /> costs. Costs vary with each site and may include such items as sewer line extensions, <br /> water lines,off-site road and frontage improvements. Off-site development costs are not <br /> covered by State Match Funds. Off-site development costs vary, and can represent 10% <br /> or more of the total building construction cost. <br /> Relocatable Facilities Cost Element <br /> Impact fees may be collected to allow acquisition of relocatable classrooms to help relieve <br /> capacity deficiencies on an interim basis. The cost allocated to new development must be <br /> growth related and must be in proportion to the current permanent versus interim space <br /> allocations by the District. <br /> 1. Cost Per Unit- the average cost to purchase and install a relocatable classroom. <br /> 2. Relocatable Facilities Cost - the total number of needed units multiplied by the cost per <br /> unit. <br /> Complete data is contained in Appendix C. Numbers may not total due to rounding. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.