My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2518 TAYLOR DR 2023-12-28
>
Address Records
>
TAYLOR DR
>
2518
>
2518 TAYLOR DR 2023-12-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 10:53:29 AM
Creation date
12/28/2023 9:28:53 AM
Metadata
Fields
Template:
Address Document
Street Name
TAYLOR DR
Street Number
2518
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 6/3/2020 <br /> City of Everett Permit Services <br /> Public Works Permit#: PW2006-006 <br /> 3200 Cedar Street, 2 Floor Associated Bldg Permit#: <br /> EVERETT <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $397.67 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> DUNN ADAM & MARGARET DUNN ADAM & MARGARET <br /> 2518 TAYLOR DR 2518 TAYLOR DR <br /> EVERETT,WA,98203-1445 EVERETT,WA,98203-1445 <br /> PHONE: PHONE:9073015767 <br /> TAX PARCEL ID#:00417000200702 SITE ADDRESS: 2518 TAYLOR DR <br /> DESCRIPTION: PAVED PATIO <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 06/03/2020.Approved plans <br /> must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upon completion of <br /> the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be <br /> managed on-site in a manner that does not adversely affect neighboring properties,including the City's right-of-way and/or <br /> easements and the improvements located therein. <br /> 10.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br /> selecting PW 24-Site Final within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br /> Public Works Permit Fee Breakdown: <br /> Paving(1,300 SF)..............................$45.00 <br /> PW Site Inspection....................................$20.00 <br /> Stormwater System Development Fee........$332.67 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> may arise because of installation and maintenance of the <br /> 7&d 7� 06/03/2020 improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BEDILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAYBE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.