My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BOEING STORMWATER MGT SYSTEM 2023-12-28
>
Address Records
>
W CASINO RD
>
3003
>
BOEING STORMWATER MGT SYSTEM
>
3003 W CASINO RD BOEING STORMWATER MGT SYSTEM 2023-12-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 1:49:49 PM
Creation date
12/28/2023 9:38:56 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BOEING STORMWATER MGT SYSTEM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett <br /> Check Treatment Option Requested EVERETT Reviewed for Permit 10/20/2021 <br /> ❑ Chitosan enhanced sand filtration with discharge to infiltration <br /> RChitosan enhanced sand filtration with discharge to temporary holding ponds (batch) <br /> Chitosan enhanced sand filtration with discharge to surface waters (flow-through) — Streams Only <br /> ❑ Electrocoagulation <br /> ❑ Other <br /> Check chemical requested <br /> ❑ FlocClearT"' (2% chitosan acetate solution) <br /> StormKlearTm LiquiFlocTA° (1% chitosan acetate solution) <br /> StormKlear TM LiquiFloc TM (3% Chitosan acetate solution) <br /> ❑ ChitoVanTM (1% chitosan acetate solution) <br /> ❑ ChitoVanTM (1.5% chitosan acetate solution) <br /> Poly Aluminum Chloride <br /> ❑ HaloSource Dual Polymer TI <br /> ;<BHR-P50 <br /> ❑ Other <br /> *Requests to use treatment chemicals that have not received approval through the <br /> CTAPE process may require a site-specific engineering report and/or an effluent toxicity <br /> evaluation through the following publication: Laboratory Guidance and Whole Effluent <br /> Toxicity Test Review Criteria Appendix G (Publication W-R-95-80). <br /> Estimate of Treatment Period <br /> Begin date: 9/27/21 End date: 2/1/2022 <br /> I hereby certify that the following information is correct: <br /> • The Stormwater Pollution Prevention Plan (SWPPP) includes the chemical <br /> treatment system specifications and design. <br /> • The best management practices (BMPs) on the site use all known, available, and <br /> reasonable methods of treatment (AKART) and I ensure that I will maintain these <br /> BMPs at AKART. <br /> • 1 reviewed the best management practices on site or those proposed in the <br /> SWPPP and believe they will not interfere with the use of chemical treatment. <br /> • I verified through jar tests that the site soil is conducive to chemical treatment. <br /> • I verified that any treated water discharging from this site enters a stream or a <br /> stormwater system that discharges to flowing fresh water, or to lakes, marine <br /> environments, or other quiescent water bodies if the chemicals used in said <br /> discharge are previously approved by Ecology. <br /> • I verified that the CESF operators received Ecology-approved training. <br /> • I read, understand, and will follow all conditions and design criteria in the <br /> applicable use level designation(s). <br /> ECY 070-258 (Rev. 1/15) <br />
The URL can be used to link to this page
Your browser does not support the video tag.