My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BOEING STORMWATER MGT SYSTEM 2023-12-28
>
Address Records
>
W CASINO RD
>
3003
>
BOEING STORMWATER MGT SYSTEM
>
3003 W CASINO RD BOEING STORMWATER MGT SYSTEM 2023-12-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 1:49:49 PM
Creation date
12/28/2023 9:38:56 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BOEING STORMWATER MGT SYSTEM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy Jenks <br /> Technical Memorandum <br /> Kyle Bringedahl, The Boeing Company <br /> 13 April 2021 <br /> KJ 2096009.00 <br /> Page 2 <br /> spillway to the detention basin. The detention basin provides additional retention and settling <br /> before the water is discharged to Power Mill Creek. The primary outlet from the detention basin <br /> is a riser with an outlet orifice at 8-feet of basin depth. This maintains depth in the basin to <br /> prevent discharges of any spilled floatables that may enter the basin. Two manually operated <br /> sluice gates are located below the 8-foot mark on the riser for maintenance use; these gates are <br /> closed during normal operations. Flow from the riser is conveyed by pipe to a concrete stilling <br /> basin for energy dissipation before discharging to Powder Mill Creek. Flow out of the detention <br /> basin is controlled by an actuated gate to maintain a maximum discharge limit of 49 cfs to the <br /> stilling basin. Storm events greater than the 25-year, 24-hour storm enter the stilling basin via <br /> the detention basin spillway. <br /> 1.3 Proposed Stormwater System <br /> The proposed stormwater retrofit will increase treatment efficiency through infrastructure and <br /> changes in operation. The scope includes: <br /> • Replacement of the existing peat filter with an enhanced media filter <br /> • Retrofitting the existing gravity-based conveyance system to route flows from the detention <br /> basin and sedimentation basin to the proposed enhanced media filter. <br /> • Installation of an above-ground stormwater lift station for improved treatment efficiency <br /> • Associated site improvements including temporary erosion and sediment controls, electrical <br /> upgrades, actuated valves, grading, slope stabilization, and resurfacing. <br /> As in the existing system, Facility runoff will enter the sedimentation basin for settling. Up to <br /> 8 cfs will exit the sedimentation basin via the existing outlet pipe, and excess flows will enter the <br /> detention basin. The existing sedimentation basin outlet pipe will tie into the proposed storm <br /> drain system to convey flows to the enhanced media filter. <br /> The outflow pipe from the existing detention basin riser will tie into the proposed storm drain <br /> system downstream of the detention basin. Detention basin flows will be conveyed into the <br /> proposed gravity-based conveyance system and comingle with flows from the sedimentation <br /> basin. The proposed conveyance system will convey up to 24 cfs to the enhanced media filter <br /> and bypass the remaining flows to the stilling basin. The enhanced media filter discharges a <br /> maximum of 8 cfs to the existing wetland via orifice-controlled outlet structures. The remainder <br /> of the treated water will gravity drain to the stilling basin. <br /> 1\kjc.locallkjc-rootlkj-projectslfederalwayl202012096009.00 boeing everett sw treatment109-reports19.08-reports-tmslcity of everelt design tmlboeing everett sw design tech memo.docx ©Kennedy/Jenks Consultants, <br /> Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.