My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BOEING STORMWATER MGT SYSTEM 2023-12-28
>
Address Records
>
W CASINO RD
>
3003
>
BOEING STORMWATER MGT SYSTEM
>
3003 W CASINO RD BOEING STORMWATER MGT SYSTEM 2023-12-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 1:49:49 PM
Creation date
12/28/2023 9:38:56 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BOEING STORMWATER MGT SYSTEM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K Kennedy Jenks Geosyritec <br /> consultants <br /> 99.999 Existing Condition as Designed Alternative <br /> Flow <br /> v 99 <br /> c <br /> M 3 95 <br /> 0 90 <br /> 00 <br /> LL <br /> 80- <br /> X <br /> 0 L <br /> M 30 <br /> 0 20 <br /> 0 10 <br /> 0 <br /> 5- <br /> 0 2 <br /> a 0.5 <br /> Avg. annual days with , <br /> flow above 0.01 cfs: 348 <br /> 0.001 <br /> 10-2 10-1 100 101 102 <br /> Flow, cfs <br /> Figure 5: Probability of flow exceedance on days with flow at Compliance Monitoring Location <br /> PMGI for Existing Condition as Designed. On average,flow is present at PMGI 348 days per a <br /> year for this alternative. <br /> 5.1.2. Copper Water Quality Exceedance <br /> The Existing Condition as Designed showed poor performance for Total Copper of the over the <br /> simulation. Treated water does not mix with untreated water in this alternative,thus concentrations <br /> of water are always fully untreated. The Copper NEL is exceeded approximately 11%of days with <br /> flow, or approximately 38 days a year, as shown in Figure 6. A comparison of the MC results to <br /> historic data collected in the last 10 years from the Bi-Annual Sampling Plan is shown in Figure 7 <br /> and show decent agreement. The MC results show slightly less frequent exceedance. This is likely <br /> due to not capturing the full natural variability of the data and potentially recent source control <br /> measures skewing the distribution. <br /> Appendix B,Page 8 <br /> Privileged and Confidential Attorney-Client Work Product <br />
The URL can be used to link to this page
Your browser does not support the video tag.