My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BOEING STORMWATER MGT SYSTEM 2023-12-28
>
Address Records
>
W CASINO RD
>
3003
>
BOEING STORMWATER MGT SYSTEM
>
3003 W CASINO RD BOEING STORMWATER MGT SYSTEM 2023-12-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 1:49:49 PM
Creation date
12/28/2023 9:38:56 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BOEING STORMWATER MGT SYSTEM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> PERMIT APPLICATION INFORMATION <br /> CONSTRUCTION MANAGER/PA/PM: Kevin Hanefeld/Ray Rimorin/Kyle Bringedahl <br /> PROJECT NAME: Stormwater Site Upgrade Project <br /> LOCATION (BLDG/FLR/COL): Stormwater Ponds/Enhanced Media Filter Area <br /> PROJECT TIMELINE& PERMIT NEED DATE: To be completed no later than January 1st 2022;ASAP (aiming <br /> for no later than 3/12) <br /> MAXIMO JOB#: 38099 <br /> CHARGELINE#: 25065486 <br /> CONTRACT PRICE OF WORK BEING $21.5M <br /> PERMITTED: <br /> CONTRACTOR NAME: IMCO; Cameron Vest <br /> CONTRACTOR E-MAIL cvest@imcoconstruction.com <br /> CONTRACTOR CELL PHONE#: 360-739-8125 <br /> CONTRACT STATE LISC#: IMC0GI*215R1 <br /> CONTRACTOR CITY OF EVERETT LISC#: 043657 <br /> BRIEF OVERVIEW OF PROJECT SCOPE: Site stormwater improvements that requires work to be done in <br /> (Do not include electrical and mechanical and around the stormwater ponds, as well as, an entire <br /> scope and costs. Contractors will secure excavation and upgrade to the existing peat sand filter. This <br /> these permits) includes the installation of new storm drains, underground <br /> vaults, pumps, and a full replacement of water quality <br /> treatment media and the associated distribution system. <br /> IN ADDITION TO PROVIDING THE ABOVE INFORMATION, PLEASE INCLUDE THE FOLLOWING <br /> DOCUMENTATION AS REQUIRED: <br /> For building permits, include (1) site plan), (2) full size drawing sets, (1) set of structural calcs, and any <br /> applicable energy code forms <br /> For pallet rack installations, include (1) site plan, (2) copies of Existing/Proposed layouts and (2) sets of <br /> structural calculations. <br /> For Public Work permits, include (1) site plan, (4) full size drawing sets and (2) sets of drainage calcs. <br /> For questions, please contact Todd Haberlack at 425-260-2668 or via email at todd.l.haberlack@boeing.com- <br />
The URL can be used to link to this page
Your browser does not support the video tag.