My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BOEING STORMWATER MGT SYSTEM 2023-12-28
>
Address Records
>
W CASINO RD
>
3003
>
BOEING STORMWATER MGT SYSTEM
>
3003 W CASINO RD BOEING STORMWATER MGT SYSTEM 2023-12-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 1:49:49 PM
Creation date
12/28/2023 9:38:56 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BOEING STORMWATER MGT SYSTEM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 9/23/2021 9/23/2021 ELEC 02-GROUND TODD JOHNS PARTIAL eTRAKiT Inspection Request <br /> WORK APPROVAL <br /> Notes: <br /> 9/21/202111:19 AM VECA(ELECT)ELECTRIC&TECH LLC <br /> Contact Name:VECA(ELECT)ELECTRIC&TECH LLC <br /> Site Address:3003 W CASINO RD <br /> Phone:2064188945 <br /> e-Mail:mike.harrison@veca.com <br /> (9/23/202112:49 PM TJJO) <br /> Approved remainder of ditch <br /> 11/22/2021 11/22/2021 ELEC 02-GROUND TODD JOHNS PARTIAL eTRAKiT Inspection Request <br /> WORK APPROVAL <br /> Notes: <br /> 11/18/20217:14 AM VECA(ELECT)ELECTRIC&TECH LLC <br /> Contact Name:Matt Marx <br /> Site Address:3003 W CASINO RD <br /> Phone:2064964793 <br /> e-Mail:mike.harrison@veca.com <br /> (11/22/20211:09 PM TJJO) <br /> Approved pipe running at bottom of containment along liner <br /> 2/23/2022 2/23/2022 ELEC 02-GROUND TODD JOHNS PARTIAL eTRAKiT Inspection Request <br /> WORK APPROVAL <br /> Notes: <br /> 2/17/2022 6:47 AM VECA(ELECT)ELECTRIC&TECH LLC <br /> Contact Name:VECA(ELECT)ELECTRIC&TECH LLC <br /> Site Address:3003 W CASINO RD <br /> Phone:2064188945 <br /> e-Mail:mike.harrison@veca.com <br /> (2/23/2022 12:41 PM TJJO) <br /> Trench from north end of poured duct bank area to vault at base of hill <br /> 3/2/2022 3/2/2022 ELEC 02-GROUND TODD JOHNS PARTIAL completion of main duct bank trench <br /> WORK APPROVAL <br /> Notes: <br /> approved trench from 8-9,top of roadway down to bottom,this completes the main duct bank <br /> I <br /> Printed:Thursday, 16 February, 2023 3 of 5 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.