Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 9/9/2021 <br /> City of Everett Permit Services Public Works Permit#: PW2109-019 <br /> 3200 Cedar Street, 211 Floor Associated Bldg Permit#: <br /> E V E R E T T <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $65.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> CITY OF MUKILTEO JEFF MALLAHAN <br /> 11930 CYRUS WAY <br /> MUKILTEO,WA, <br /> PHONE: PHONE:4253373174 <br /> TAX PARCEL ID#:00631400000001 SITE ADDRESS:7609 44TH AVE W <br /> DESCRIPTION: INSTALLATION OF APPROVED MITIGATION PLAN <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications <br /> for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans and drainage report approved by the City of Everett Public Works Department dated 09/09/2021. <br /> Approved plans must remain on job-site at all times. <br /> 5. It is the applicant/contractor's responsibility to ensure coverage under Ecology's Construction Stormwater General Permit is obtained and <br /> maintained throughout the entire construction duration. <br /> 6. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br /> required inspections.An Inspection Handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 7. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector or the approved <br /> SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br /> 8. Keep City streets clean at all times. No dirt, mud,rocks,or debris to be tracked onto roadway. <br /> 9. Protect all existing underground utilities(to remain)during construction. <br /> 10.All excavated material shall be hauled to an approved,permitted site. <br /> 11. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a haul route will be required to be submitted to <br /> the City of Everett prior to permit issuance.Contact the Traffic Engineering Department for Street Use Permits and any required Oversize <br /> Load Permits at 425-257-8810(press Option 7 for Traffic). <br /> 12.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br /> selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests when all items have been completed for <br /> this permit. <br /> Public Works Permit Fee Breakdown: <br /> Grade/Fill/Excavate(10CY)...............$25.00 <br /> PW Plan Review.....................................$20.00 <br /> PW Site Inspection..............................$20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> may arise because of installation and maintenance the <br /> 09/09/2021 improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAYBE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />