My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6414 HARDESON RD 2024-01-02
>
Address Records
>
HARDESON RD
>
6414
>
6414 HARDESON RD 2024-01-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 9:54:26 AM
Creation date
12/28/2023 1:32:32 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
6414
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2208-103 Description: ELECTRICAL Alteration IN TELCO ROOM <br /> Applied:8/10/2022 Approved:8/11/2022 Site Address: 6414 HARDESON RD <br /> Issued:8/11/2022 Finaled: City,State Zip Code: EVERETT,WA <br /> Status:ARCHIVED-NOT FINALED Applicant: LIN R ROGERS ELECTRICAL INC <br /> Parent Permit: Owner:COMMERCE ROAD TERMINALS LLC <br /> Parent Project: Contractor: LIN R ROGERS ELECTRICAL INC <br /> Details: <br /> Installing(1)transformer,(1)disconnect for the transformer,(1)UPS cabinet,(1)disconnect for the UPS cabinet,(1)UPS bypass <br /> switch,(1)sub panel,and (1)busway. <br /> ELECTRICAL Alteration IN TELCO ROOM <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 2/3/2023 2/3/2023 ELEC 10-FINAL MIKE BEARDA NO ACCESS eTRAKiT Inspection Request <br /> Notes: <br /> 2/1/2023 12:35 PM LIN R ROGERS ELECTRICAL INC <br /> Installing(1)transformer,(1)disconnect for the transformer,(1)UPS cabinet,(1)disconnect for the UPS cabinet,(1)UPS bypass switch,(1)sub panel, <br /> and(1)busway. <br /> Tech note: <br /> Mounted transformer disconnect in electrical room.Built rack to hold new UPS transformer. Installed new transformer above old transformer in <br /> electrical room.Ran conduit from new transformer to Telco room UPS panel disconnect.Installed UPS panel disconnect,UPS panel and UPS transfer <br /> switch in electrical room.Ran conduit between UPS Panel Disconnect and UPS tarnsfer switch.Ran conduit between UPS transfer switch and UPS panel. <br /> Installed batteries and power supplies in UPS cabinet.Ran SO cord whips between UPS cabinet and and UPS tarnser switch.Ran associated <br /> communication wires between UPS cabinet and data rack.Installed supports above grid to hold new bus duct.Installed bus duct above equipment in <br /> Telco room.Installed devices onto bus dcut above Telco room equipment.Installed new surface mount Quad recepticles for Telco room equipment. <br /> Installed new breaker for UPS panel transformer.Turned on power and verified 120/240 at new UPS panel.Verified correct voltage for all new devices <br /> installed.UPS cabinet is ready for commissioning. <br /> Contact Name:LIN R ROGERS ELECTRICAL INC <br /> Site Address:6414 HARDESON RD <br /> Phone:6787016692 <br /> e-Mail:License@LRogersElectric.com <br /> Tenant is unaware of work done. Please call inspector with contact info between 730 and 830 morning of inspection.Access to deenergized <br /> transformer? <br /> 2/22/2023 2/22/2023 ELEC 10 FINAL MIKE BEARDANO ACCESS eTRAKiT Inspection Request <br /> Notes: <br /> 2/16/2023 9:10 AM LIN R ROGERS ELECTRICAL INC <br /> Contact Name:LIN R ROGERS ELECTRICAL INC <br /> Site Address:6414 HARDESON RD <br /> Phone:7707723400 <br /> e-Mail:License@LRogersElectric.com <br /> I <br /> Printed:Thursday,28 December,2023 1 of 1 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.