Laserfiche WebLink
u <br />I I <br />L <br />APPENDIX C <br />REPORT LIMITATIONS AND GUIDELINES FOR USED <br />This appendix provides information to help you manage your risks with respect to the use of this report. <br />Read These Provisions Closely <br />It is important to recognize that the geoscience practices (geotechnical engineering, geology and <br />environmental science) rely on professional judgment and opinion to a greater extent than other <br />engineering and natural science disciplines, where more precise and/or readily observable data may exist. <br />To help clients better understand how this difference pertains to our services, GeoEngineers includes the <br />following explanatory "limitations" provisions in its reports. Please confer with GeoEngineers if you need to <br />know more how these "Report Limitations and Guidelines for Use" apply to your project or site. <br />Geotechnical Services Are Performed for Specific Purposes, Persons and Projects <br />This report has been prepared for use by the Everett Housing Authority and their authorized agents. The <br />information contained herein is not applicable to other sites or projects. <br />GeoEngineers structures its services to meet the specific needs of its clients. No party other than the party <br />to whom this report is addressed may rely on the product of our services unless we agree to such reliance <br />in advance and in writing. Within the limitations of the agreed scope of services for the project, and its <br />schedule and budget, our services have been executed in accordance with our agreement with the Everett <br />Housing Authority and generally accepted geotechnical practices in this area at the time this report was <br />prepared. We do not authorize, and will not be responsible for, the use of this report for any purposes or <br />projects other than those identified in the report. <br />A Geotechnical Engineering or Geologic Report is Based on a Unique Set of Project -Specific <br />Factors <br />This report has been prepared for the Baker Heights Redevelopment project in Everett, Washington. <br />GeoEngineers considered a number of unique, project -specific factors when establishing the scope of <br />services for this project and report. Unless GeoEngineers specifically indicates otherwise, it is important not <br />to rely on this report if it was: <br />■ Not prepared for you, <br />■ Not prepared for your project, <br />■ Not prepared for the specific site explored, or <br />■ Completed before important project changes were made. <br />1 Developed based on material provided by ASFE, Professional Firms Practicing in the Geosciences; www.asfe.org- <br />' GEOENGINEERS� October30, 2019 Page C-1 <br />File W 21288-002-00 <br />