Laserfiche WebLink
i M M= M M M w M M M M M M M M M M i <br />!1288-002-00 Date Exported: 4/15/20 <br />3 <br />1.40 <br />1.20 <br />Pre -Soak Testing Phase <br />1.00 <br />0.40 <br />0.20 <br />0.00 <br />3/31/20 10:33 3/31/20 11:45 3/31/20 12:57 3/31/20 14:09 3/31/20 15:21 3/31/20 16:33 3/31/20 17:45 3/31/20 18:57 <br />Notes: <br />1. PIT-1 was completed on March 31, 2020. <br />2. After approximately 7 hours the remaining water in the test pit was removed by bailing in order to facilitate <br />over -excavation of the test pit. <br />3. The testing phase head range was analyzed during the testing period. <br />PIT-1 Hydrograph <br />Baker Heights Redevelopment <br />Everett, Washington <br />GEOENGINEERS Figure <br />