My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2616 COLBY AVE FRYING LEMON FISH 2024-02-09
>
Address Records
>
COLBY AVE
>
2616
>
FRYING LEMON FISH
>
2616 COLBY AVE FRYING LEMON FISH 2024-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 1:30:36 PM
Creation date
12/29/2023 3:31:31 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2616
Tenant Name
FRYING LEMON FISH
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> toso3Rochelle Jones<rochelle@catchstudio.com> <br /> by(0,38le <br /> City of Everett Permit Services: 2621 Rockefeller Avenue (B1912-029) <br /> 1 message <br /> Drew Martin<dmartin@everettwa.gov> Mon,Mar 2,2020 at 3:19 PM <br /> To:"rochelle@catchstudio.com"<rochelle@catchstudio.com>,"nosicatchstudio.com"<nos@catchstudio.com> <br /> Hello Rochelle, <br /> This email recaps our discussion of this project. There are a couple of items that appear to be missing from the construction drawings that I can <br /> redline. I will need you to provide additional information for the existing roof that will support new equipment weight in addition to existing equipment <br /> and other weights(e.g.,snow,etc.). The following should be addressed: <br /> 1.Structural calculations evaluating the existing roof structure for all existing and new weights should be submitted for review. Note that the Key <br /> Plan on Sheet M1 includes posts down the length of the building,suggesting that beams may run between these,and that the roof joists may run <br /> in the east-west. If this is correct,then the orientation of the joists shown in the section on Sheet M2 is not correct. The joist orientation should <br /> be verified. <br /> 2.It is presumed that modification of the roof structure is not required. If modification is required,a separate building permit will be required. <br /> Alternatively,structural modifications may be included in the building permit for this project. Note that this review has been completed. It is <br /> recommended that changes and additions be made before the permit is issued. <br /> 3.The MUA may require secondary structural framing,such as blocking between the joists,to support the units. Minor framing of this nature may <br /> be included in the mechanical drawings. A detail should be included in the construction drawings. <br /> Please let me know if you have questions. <br /> Drew Martin,P.E.,S.E. <br /> Associate Engineer—Commercial Plans Examiner I Permit Services <br /> EVERETT 425.257.8813 13200 Cedar Street,2nd Floor,Everett,WA 98201 <br /> Hours:Monday—Friday 7:30am-12:O0pm and 1:00pm-4:00pm <br /> everettwa.gov I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public Records Act. <br /> image0014png <br /> 2K <br /> le Eszia -r T <br />
The URL can be used to link to this page
Your browser does not support the video tag.