Laserfiche WebLink
JB SIB EG E3 FB D DE CB F El AB <br />!❑' ❑ ❑'❑i r ❑', <br />I I I I I I I I I <br />[2B�- <br />El El <br />0 l D 0 'I 1 El � l <br />Ll <br />E BCU-B02 <br />IL <br />it <br />,I _ <br />--, _-- <br />t=� "i 1 <br />D Y _ E BCU-BO5 <br />I I I I ❑', I --- BOcu-eo4 c <br />-_-- �� E)22HWR <br />BCU-603 <br />it <br />E BCU-B01 <br />,I <br />T <br />j - (E)STANDPIPE o n <br />0 <br />-- I I 2 <br />--- ---- I 1- <br />I I I <br />I I I I I <br />I I I I <br />I I I I <br />I I I I I I I I I I <br />I <br />I <br />— — — — 0 `❑ ❑ <br />2"HWS � 6 <br />41, <br />+2"HOUR w <br />_ 3 8"EWES (2) TO RO F <br />I IF io BP_1 m BP_2 <br />NEW 4"CA TO <br />r B_1 B=2 EXISTING WATER <br />i 3 HEATER. WATER <br />IHEATER FLUE TO <br />C J REMAIN AS -IS. <br />N� <br />- - - - (E)BT-I;_____________________ _ I of LE <br />2"HW "Hw 5 <br />-------------- <br />I9 <br />II � P=1-------------------------- <br />^ <br />y N z <br />r'IECNANICAL------------- ----- <br />_ _ — —2"HOUR- — 3"HNR --0- <br />MFMF1 _ <br />BO I Ys"HWS <br />N B Ys"HNR B A B <br />I. HALLTF <br />l l <br />4 <br />a <br />'[� <br />ELECTRICAL <br />TR—B E0� <br />F-1 <br />Ur2 B02 <br />SCALE:1/4" = 1'-0" <br />DRAWING NOTES: <br />FLAG NOTES: <br />1. PIPING IS DIAGRAMMATIC. PROVIDE FITTINGS <br />1 <br />ATTACH NEW 2"HWS AND HWR TO EXISTING. <br />AND OFFSETS AS REQUIRED TO AVOID WORK <br />OF OTHER TRADES AND AS REQUIRED FOR A <br />2 <br />INSULATE EXISTING 2"HWS AND HAR IN MECH ROOM, <br />CODE COMPLIANT INSTALLATION. <br />BEHIND BCU-B01. <br />2. SBSMICALLY RESTRAIN ALL PIPING AND <br />3' <br />SEE FLUE ELEVATION DETAIL, SHEET M3.0. <br />EQUIPMENT. CONTRACTOR SHALL PROVIDE <br />KJ <br />SEISMIC DESIGN AND CALCULATIONS TO <br />4 <br />EXTEND NEW CA DUCTS THROUGH NEW CLOSURE <br />EVERETT BUILDING DEPARTMENT AS A <br />PANEL AND FLASH WEATHER TIGHT. <br />DEFERRED SUBMITTAL. <br />D�_ <br />SET NEW PUMPS ON NEW 47H X 18" X 36" <br />3. 3° HYDRONIC PIPING SHALL BE WELDED SCH <br />HOUSEKEEPING PADS, DOWELED TO EXISTING FLOOR. <br />40 STEEL PER SPECS. <br />INSTALL 8"CPVC FLUES INSIDE OF EXISTING <br />4. 3" STEEL PIPING SHALL USE FLANGED GATE <br />MASONRY FLUE. BRACE FLUES AT BOTTOM, CENTER <br />VALVES. <br />AND TOP. AT TOP OF EXISTING CHIMNEY, REPLACE <br />MISSING BRICKS AND INSTALL A SHEETMETAL <br />5. INSTALL DI -ELECTRIC WATERWAY FITTINGS <br />CLOSURE CAP, SEE DETAIL ON SHEET M3.0. <br />WHERE STEEL PIPING CONNECTS TO EXISTING <br />COPPER PIPING, <br />EXTEND RETURN WATER PIPING TO EXISTING <br />REVERSE -RETURN LOOP IN CRAM SPACE, SOUTH <br />6. DOMESTIC WATER PIPING SHALL BE TYPE L <br />OF ELECTRICAL ROOM, <br />COPPER. <br />8� <br />INSTALL DE -COUPLER LOOP DIMENSION AS <br />7. PROMDE ALL SAFETY DEVICES REQUIRED BY <br />REQUIRED BY BOILER MANUFACTURER'S PUBLISHED <br />WAC 296-104-302. <br />INSTALLATION INSTRUCTIONS. <br />EXTEND 3/4" NON -POTABLE PIPING FROM MAKE-UP <br />ASSEMBLY TO INLET SIDE OF AIR SEPARATOR. <br />A <br />I I <br />6 D <br />L J <br />C <br />KEY PLAN <br />approvals: <br />R GREENBUSCH GROUP, INC <br />Silver Lake Elementary <br />Boiler Replacement <br />address: <br />12815 Bothell -Everett Highway <br />Everett, WA 98208-6630 <br />design phase: <br />PERMIT <br />SET <br />revisions: <br />no. description date <br />F� <br />°� cT <br />ONAL'� .1ti <br />design by: R L / A V <br />drawn by: J A / J Z <br />scale: as noted <br />date: 11 /15/2022 <br />job no.: 2022.125 <br />sheet title: <br />BOILER ROOM <br />MECHANICAL PLAN <br />sheet number: <br />M1.2 <br />