My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12815 19TH AVE SE 2024-02-14
>
Address Records
>
19TH AVE SE
>
12815
>
12815 19TH AVE SE 2024-02-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 11:30:11 AM
Creation date
1/2/2024 3:26:21 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12815
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> N. <br /> RI <br /> CITY OF EVERETT <br /> EVERETT DIECtl llV <br /> WASHINGTON Permit Services Transmittal <br /> JUL 2 8 2023 <br /> PERMIT/PROJECT#: E2307-008 <br /> SITE ADDRESS: 12815 BOTHELL-EVERETT HWY CITY OF EVERETT <br /> PROJECT NAME: SILVER LAKE ELEMENTARY-BOILER REPLACEMENT <br /> Permit Services <br /> FROM: LANCE DAVIS COMPANY:AWA ELECTRICAL CONSULTANTS 0 Chronology—Permit Counter Transmittal <br /> 0 <br /> (255) 775-1799 x103 lance@awaelec.com Plan Review Routing <br /> PHONE If: EMAIL: Location: ❑File ❑Reviewer Office <br /> Date Logged By: <br /> Route to:(check all that apply) Name of Reviewer Type of Review <br /> ❑Planning Reviewer Name: Q Re-Review <br /> ❑Public Works Reviewer Name: ❑Revisions After Approval <br /> ❑Building Reviewer Name: Revisions After Issuance <br /> ❑Fire Reviewer Name: Other <br /> Q Other Reviewer Name:Steve Banks 0 Other <br /> Provide quantities for all items submitted <br /> PLANS REPORTS/CALCULATIONS OTHER DOCUMENTS <br /> City Qty Qty <br /> _Arch./Bldg.Plans _ Geotechnical Report _ Correction Letter Responses <br /> Structural Plans _ Drainage Report _ Draft Easement <br /> _Civil Plans _ SWPPP Report _ Recorded Easement <br /> Site Plan Wetland Report _ Height Survey <br /> Landscape Plan _ Critical Area Report — Base Elevation Survey <br /> _Survey _Traffic Study/TDM Report _ Critical Area Covenant <br /> Elevations Structural Calculations Stormwater Covenant <br /> 1 Floor Plans ` Height Calculations _ Covenant-Other <br /> Special Inspection Report _ Plumbing Calculations _ Performance Guarantee <br /> _As-Builts _ Other _ Warranty Bond <br /> Plat Maps — Other _ Other <br /> Original City Redlines Returned _ Other T Other <br /> 1 Other Cover Sheet/Panel Schedules Other Other <br /> 1 Other One-Line Diagram/Load Calculations Other Other <br /> Items submitted are: <br /> Complete Plan Replacement Sets Q Revised Plan Sheets ❑Additional Documents <br /> (Applicant to slip-slieet at uottnter) (Add to file) <br /> Comments to Reviewer:Hi Steve, here is a updated complete set of the Silver Lake Elementary project. <br /> I fixed the errors in the panel schedules. <br /> Signed: • '42"»4' Date: 7/28/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.