My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County PUD 1/2/2024
>
Contracts
>
Real Property
>
Licenses
>
Snohomish County PUD 1/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 10:53:20 AM
Creation date
1/3/2024 10:52:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County PUD
Approval Date
1/2/2024
Council Approval Date
11/29/2023
End Date
3/31/2030
Department
Real Property
Department Project Manager
Paul McKee
Subject / Project Title
Municipal Pole Attachement License Agreement
Tracking Number
0004112
Total Compensation
$6,000.00
Contract Type
Real Property
Contract Subtype
Licenses
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
-8- <br />Licensee within thirty (30) days of the date Licensor notifies Licensee of the unauthorized <br />pole attachment. <br /> <br />2.08 Overlashing <br /> <br />The following permit application process will be utilized for proposed overlash <br />construction. <br /> <br />(a) Licensee will submit application form and Application Fee in accordance <br />with Sections 2.01 and 2.02. <br /> <br />(b) Licensor shall review the application in accordance with Section 2.03 and <br />will identify and record any existing NESC violations. If during the review, Licensor <br />identifies any defects and/or violations that would constitute a critical safety hazard (as <br />solely determined by Licensor), then Licensor will correct the defect/violation to eliminate <br />safety hazard prior to allowing Licensee to proceed with overlash construction. <br /> <br />(c) Subject to review and correction of any identified critical safety hazards per <br />Section 2.08(b), if the proposed overlash construction does not create an NESC violation <br />or worsen an existing violation, Licensor will approve the application and allow Licensee <br />to proceed with overlash construction. <br /> <br />(d) Upon completion of overlash construction, Licensee will complete/close <br />out the National Joint Use Notification System (“NJUNS”) ticket generated by Licensor <br />when the permit for the overlash construction was issued by Licensor and Licensor may <br />review completed overlash construction. <br /> <br />(e) There shall be no annual attachment fee associated with such approved <br />overlash permits. <br /> <br />III. FEES <br /> <br />3.01 Amount <br /> <br /> (a) Annual Attachment Fee. The Licensee agrees to pay to the Licensor for each <br />attachment per pole, as consideration for the permits to place its Equipment on Licensor’s <br />poles as described herein, the annual attachment fee(s) set forth in the Licensor’s Joint Use <br />Schedule to this Agreement. Such annual charges shall be paid within thirty (30) days of <br />Licensee’s receipt of Licensor’s pole count and pole attachment identified itemized <br />invoices in semi-annual installments. In the event Licensor does not receive payment <br />within said thirty (30) day period, a late penalty of one percent (1.0 %) per month may be <br />added on the unpaid amount past due. <br /> <br /> (b) Method of Computation. The amount of semi-annual payment due for each <br />six (6) month period shall be determined by Licensor based upon the total number of <br />attachments on poles permitted as of December 15 for the January 1 to June 30 period and <br />as of June 15 for the following July 1 to December 31 period. <br />
The URL can be used to link to this page
Your browser does not support the video tag.