Laserfiche WebLink
<br />City of Everett <br />CoEV-Devel <br /> <br />FINAL <br />11/20/2023 Page 1 of 5 Scope of Work <br /> <br />Exhibit A <br />Scope of Work—Floyd|Snider Team <br /> <br />Effective Date: January 1, 2024 <br />End Date: December 31, 2028 <br />Client: City of Everett <br />Project Name: CoEV-DEVEL <br />Client Contact: Randy Loveless <br />F|S Project Manager <br />and key team: <br />Kathryn Snider, Jeff Gabster <br /> <br />OVERALL SCOPE OF SERVICES/OBJECTIVE <br />The Floyd|Snider team will provide engineering and environmental services to assist the City of <br />Everett (City) with ongoing development, operation and maintenance, environmental monitoring <br />and reporting, and related activities at the Everett Landfill Site (Site). The City’s responsibilities <br />for these activities primarily arise from the Consent Decree (CD) for the Site between the <br />Washington State Department of Ecology (Ecology), the City, and the current owner and <br />developer of the Site, Riverfront Commercial Investment, LLC (Riverfront). The CD includes <br />provisions to ensure protection of human health and the environment associated with toxic <br />contaminants and landfill gas (LFG) present at the Site, for both the current and future <br />redeveloped Site conditions. The City’s responsibilities include oversight of Riverfront’s design <br />and construction for development of the site, ongoing environmental monitoring, and other <br />public safety considerations. Floyd|Snider’s primary roles include assisting the City with <br />maintaining compliance with the CD, as well as strategy and coordination of communications <br />between the City, Riverfront, and Ecology. <br />The estimated fee for this Scope of Work, as presented in the attached fee estimate, will be <br />invoiced based on time and materials and the total of $1,257,833 will not be exceeded without <br />written authorization. This fee estimate addresses the fact that there will be annual rate <br />adjustments over the duration of this Scope of Work. <br />Task 1 — Development Review Support <br />Scope: Floyd|Snider will conduct the following review support services associated with <br />development of the Site. For the purpose of this scope and fee estimate, it is assumed that Riverfront <br />will submit up to 10 major permits in total for building construction and site work during the 5-year <br />contract duration, and that these permits will require a similar level of effort for design review, CD