My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/01/03 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/01/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 4:05:09 PM
Creation date
1/5/2024 9:01:14 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/3/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: <br />Supplemental Agreement No. 2 to the Standard Consultant Agreement with TranTech Engineering, LLC <br />for additional design services for the Edgewater Creek Bridge Replacement Project. <br /> <br />Council Bill # <br /> <br />Consideration: Professional Services Agreement <br />Project: Edgewater Creek Bridge Replacement <br />Partner/Supplier: TranTech Engineering, LLC <br /> Location: Mukilteo Boulevard at Edgewater Creek <br />Preceding action: Professional Services Agreement Supplement No. 1, 8/11/22 <br />Fund: 303 – Public Works Improvement Projects <br />Agenda dates requested: <br />January 3, 2024 <br /> <br />Briefing <br />Proposed action <br />Consent x <br />Action - <br />Ordinance <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />Supplemental Agreement <br /> <br />Department(s) involved: <br /> Public Works, Legal <br /> <br />Contact person: <br /> Tom Hood <br /> <br />Phone number: <br /> (425) 257-8809 <br /> <br />Email: <br /> thood@everettwa.gov <br /> <br />Initialed by: <br /> RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />The programmed available funding for this project, as established by City of Everett <br />Ordinance No.3719-19 is $22,000,000. <br /> <br />This supplement adds additional design services costs, not to exceed $138,396 for a new <br />maximum amount payable of $3,647,608. <br /> <br /> <br />Project summary statement: <br />This supplement includes additional design phase services essential for accommodating <br />structural modifications to walls and bridges. <br />This project will remove and replace the existing Edgewater Creek Bridge, which was <br />built in 1946 and is a vital link in a chain of three bridges that provide the only access to <br />neighborhoods along Mukilteo Boulevard. <br /> <br /> <br />Recommendation (exact action requested of Council): <br />Authorize the Mayor to sign Supplemental Agreement No. 2 to the Standard Consultant <br />Agreement with TranTech Engineering, LLC for additional design services for the <br />Edgewater Creek Bridge Replacement for an additional $138,396. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.