SCOPE OF WORK:
<br /> TO INSTALL A ROOF MOUNTED SOLAR PHOTOVOLTAIC EQUIPMENT SUMMARY GOVERNING CODES SYSTEM RATING
<br /> SYSTEM AT THE OWNER RESIDENCE LOCATED AT 20 HANWHA Q CELL Q.PEAK DUO BLK ML-G10+ (400W) 2018 INTERNATIONAL RESIDENTIAL CODE $.00 KWDC
<br /> 607 KINGS PLACE EVERETT, WA 98203. MODULES 2018 INTERNATIONAL BUILDING CODE
<br /> THE POWER GENERATED BY THE PV SYSTEM WILL BE 2018 INTERNATIONAL FIRE CODE 5.90 KWAC
<br /> INTERCONNECTED WITH THE UTILITY GRID THROUGH THE 20 ENPHASE IQ7PLUS-72-2-US(240V) MICROINVERTERS 2020 NATIONAL ELECTRICAL CODE
<br /> EXISTING ELECTRICAL SERVICE EQUIPMENT. WASHINGTON ADMINISTRATIVE CODE (WAC) SHEET INDEX
<br /> THE PV SYSTEM DOES NOT INCLUDE STORAGE BATTERIES. PV-0 COVER PAGE
<br /> PV-1 SITE PLAN
<br /> PV-2 ROOF PLAN &MODULES
<br /> PV-2A STRING LAYOUT&BOM
<br /> GENERAL NOTES:
<br /> PV-3 ATTACHMENT DETAIL• THESE CONSTRUCTION DOCUMENTS HAVE BEEN BASED IE WIRING AND CONDUIT NOTES: PV-3A ATTACHMENT DETAIL
<br /> FIELD INSPECTIONS AND ALL CONDUIT SIZES AND TYPES, SHALL BE LISTED FOR ITS PV-4 ELECTRICAL LINE DIAGRAM&CALCS. SYSTEM INFO.
<br /> OTHER INFORMATION AVAILABLE AT THE TIME.ACTUAL FIELD CONDITIONS MAY REQUIRE PURPOSE AND APPROVED FOR THE SITE APPLICATIONS (20)HANWHA Q CELL Q.PEAK DUO BLK
<br /> MODIFICATIONS IN CONSTRUCTION DETAILS. PV-4A SPECIFICATIONS&CALCULATION
<br /> •
<br /> ALL PV CABLES AND HOMERUN WIRES BE#10AWG *USE-2, PV ML-B10+(40ow)
<br /> • ARCHITECT HAS NOT BEEN RETAINED TO SUPERVISE ANY CONSTRUCTION OR PV-5 SIGNAGE (20)ENPHASE IQ7PLUS-72-2-US(240V)
<br /> INSTALLATION OF ANY EQUIPMENT AT SITE. WIRE, OR PROPRIETARY SOLAR CABLING SPECIFIED BY MFR, pV_g+ EQUIPMENT SPECIFICATIONS
<br /> OR EQUIVALENT; ROUTED TO SOURCE CIRCUIT COMBINER DC SYSTEM SIZE:8.00 KWDC
<br /> • CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TOOLS, OBTAINS ALL BOXES AS REQUIRED AC SYSTEM SIZE:5.90 KWAC
<br /> PERMITS, LICENSES AND PAY ALL REQUIRED FEES AND COMPLETE INSTALLATION. . ALL CONDUCTORS AND OCPD SIZES AND TYPES SPECIFIED REVISIONS
<br /> • CONTRACTOR HAS THE FULL RESPONSIBILITY TO CHECK AND VERIFY ALL DIMENSIONS ACCORDING TO[NEC 690.8 (A)(1)&(B)(1)], [NEC 240] [NEC PROJECT SITE
<br /> AND EXISTING CONDITIONS.ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER DESCRIPTION DATE REV
<br /> BEFORE PROCEEDING WITH THE WORK.ANY WORK STARTED BEFORE CONSULTATION P FOR MULTIPLE CONDUCTORS
<br /> ALL
<br /> • ALL
<br /> AND ACCEPTANCE BY THE ENGINEER SHALL BE THE SOLE RESPONSIBILITY OF THE CONDUCTORS IN CONDUIT EXPOSED TO SUNLIGHT
<br /> CONTRACTOR AND SHALL BE SUBJECT TO CORRECTION BY THEM WITHOUT ADDITIONAL SHALLLL BEE DERATED ACCORDING TO [NEC TABLE 310.15
<br /> COMPENSATION. (B)(2)(C)] BLACK ONLY**
<br /> DAMAGE CAUSED TO THE EXISTING STRUCTURE, PIPES, DUCTS, WINDOWS, WALL, EXPOSED ROOF PV DC CONDUCTORS SHALL BE USE-2, 90°C Signature with Seal
<br /> • RATED,WET AND UV RESISTANT,AND UL LISTED RATED FOR
<br /> FLOORS, ETC. SHALL BE REPAIRED TO THE ORIGINAL CONDITION OR REPLACED BY THE
<br /> 600V, UV RATED SPIRAL WRAP SHALL BE USED TO PROTECT
<br /> CONTRACTOR AT NO ADDITIONAL COST. Q
<br /> THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR THE PROPER INSTALLATION AND WIRE FROM SHARP EDGES
<br /> • 4-WIRE DELTA CONNECTED SYSTEMS HAVE THE PHASE WITH
<br /> COMPLETION OF THE WORK WITH APPROVED MATERIALS. THE HIGHER VOLTAGE TO GROUND MARKED ORANGE OR
<br /> • NO CHANGES ARE TO BE MADE WITHOUT THE CONSULTATION AND APPROVAL OF THE
<br /> ARCHITECT. IDENTIFIED BY OTHER EFFECTIVE MEANS
<br /> •
<br /> • CONTRACTOR SHALL OBTAIN BOLDING PERMIT. NO WORK TO START UNLESS BUILDING ALL SOURCE CIRCUITS SHALL HAVE INDIVIDUAL SOURCE
<br /> CIRCUIT PROTECTION
<br /> PERMIT IS PROPERLY DISPLAYED. • VOLTAGE DROP LIMITED TO 2%
<br /> • ALL WORKMANSHIP AND MATERIALS SHALL BE OF FIRST QUALITY AND IN COMPLIANCE PROJECT NAME&ADDRESS
<br /> WITH THE REQUIREMENTS OF THE WA BUILDING CODE, THE DEPARTMENT OF • AC CONDUCTORS>4AWG COLOR CODED OR MARKED: PHASE
<br /> ENVIRONMENTAL PROTECTION AND ALL PERTINENT AGENCIES. A OR L1-BLACK, PHASE B OR L2- RED, PHASE C OR L3-BLUE,
<br /> • IT IS ESSENTIAL THAT ALL WORK PROCEED WITH THE MAXIMUM COOPERATION OF ALL NEUTRAL-WHITE/GRAY z
<br /> PARTIES AND WITH MINIMUM INTERFERENCE TO THE OCCUPANTS WITHIN THE BUILDING. M p
<br /> THE OWNER'S DIRECTIONS IN THIS REGARD SHALL BE FULLY COMPLIED WITH. 1 o co
<br /> • ALL EXPOSED PLUMBING, HVAC, ELECTRICAL DUCTWORK, PIPING AND CONDUITS ARE TO PV-o HOUSE PHOTO SCALE:NTS � Uj v 00 o
<br /> BE PAINTED BY GENERAL CONTRACTOR. uJ () Q CD C)
<br /> • THE CONTRACTOR SHALL PERFORM THE WORK IN STRICT CONFORMANCE WITH THE > Z a Q o
<br /> LOCAL LAWS, REGULATIONS AND THE NATIONAL ELECTRIC CODE. J LLI coo
<br /> • THE CONTRACTOR SHALL OBTAIN ALL PERMITS,APPROVALS,AFFIDAVITS, PROJECT SITE Q
<br /> CERTIFICATIONS, ETC.AND PAY ALL FEES AS REQUIRED BY THE LOCAL AUTHORITIES. Z I— o
<br /> • CONTRACTORS SHALL OBTAIN FIRE CERTIF. UPON COMPLETION OF WORK. © < L11 `� W
<br /> ELECTRICAL NOTES: LUC) W
<br /> • THE EQUIPMENT AND ALL ASSOCIATED WIRING AND INTERCONNECTION SHALL BE INSTALLED ONLY BY QUALIFIED PEOPLE.A QUALIFIED PERSON IS Everett z C.0W Z
<br /> D_
<br /> ONE WHO HAS SKILLS AND KNOWLEDGE RELATED TO THE CONSTRUCTION AND OPERATION OF THE ELECTRICAL EQUIPMENT AND INSTALLATIONS
<br /> J Q
<br /> AND HAS RECEIVED SAFETY TRAINING TO RECOGNIZE AND AVOID THE HAZARDS INVOLVED. (NEC 690.4(C), NEC 2020) PORT GARUNER
<br /> • LOCAL UTILITY PROVIDER SHALL BE NOTIFIED PRIOR TO USE AND ACTIVATION OF ANY SOLAR PHOTOVOLTAIC INSTALLATION. FOR A LINE SIDE TAP
<br /> CONNECTION, UTILITY NEEDS TO BE NOTIFIED WELL IN ADVANCE TO COORDINATE BUILDING ELECTRICAL SHUT OFF. 607 Kings PI, Everett,
<br /> • NEW CONDUIT ROUTING SHOWN IS ESSENTIALLY SCHEMATIC. SUBCONTRACTOR SHALL LAY OUT RUNS TO SUIT FIELD CONDITIONS AND THE WA 98203, USA DATE:03/31/2022
<br /> COORDINATION REQUIREMENTS OF OTHER TRADES. SHEET NAME
<br /> • ARRAY WIRING SHOULD NOT BE READILY ACCESSIBLE EXCEPT TO QUALIFIED PERSONNEL. COVER PAGE
<br /> • ALL EXTERIOR CONDUIT, FITTINGS,AND BOXES SHALL BE WATERTIGHT AND APPROVED FOR USE IN WET LOCATIONS. (NEC 690), NEC 2020.
<br /> • WIRING METHODS FOR PV SYSTEM CONDUCTORS AREN'T PERMITTED WITHIN 10 IN. OF THE ROOF DECKING OR SHEATHING EXCEPT WHERE LOCATED
<br /> DIRECTLY BELOW THE ROOF SURFACE THAT'S COVERED BY PV MODULES AND ASSOCIATED EQUIPMENT WIRING SHEET SIZE
<br /> • BACK-FED BREAKER MUST BE AT THE OPPOSITE END OF BUS BAR FROM THE MAIN BREAKER OR MAIN LUG SUPPLYING CURRENT FROM THE UTILITIES.
<br /> GLACIERVIEY,
<br /> • ALL CONDUCTORS AND WIRE TIES EXPOSED TO SUNLIGHT ARE LISTED AS UV RESISTANT. © ANSI B
<br /> • CONTRACTOR SHALL FOLLOW ALL ELECTRICAL EQUIPMENT LABELING REQUIREMENTS IN NEC 690 11" X 17"
<br /> • PV SOURCE, OUTPUT AND INVERTER CIRCUITS SHALL BE IDENTIFIED AT ALL POINTS OF TERMINATION, CONNECTION,AND SPLICES. THE MEANS OF ID SHEET NUMBER
<br /> CAN BE SEPARATE COLOR CODING, MARKING TAPE,TAGGING ETC. (NEC 690.4), NEC 2020. 1VICINITY MAP SCALE:NTS
<br /> • MEASURE THE LINE-TO-LINE AND LINE-TO-NEUTRAL VOLTAGE OF ALL SERVICE ENTRANCE CONDUCTORS PRIOR TO INSTALLING ANY SOLAR Pv-o
<br /> EQUIPMENT. THE VOLTAGES FOR THE 240VAC RATED. PV_0
<br />
|