Laserfiche WebLink
We would be happy to include into the project,the installation of Boundary Markers to clearly call out <br /> the wetland/sensitive areas to reduce/eliminate possible encroachment. <br /> The project is three jump lines, each at different lengths. <br /> The Black Line would be the longest line and it would end at the required buffer boundary. <br /> What is the ideal buffer distance to the wetland? <br /> I can redraw the sketch to scale for your further review. <br /> Thanks, <br /> Tony T <br /> From: Steve Ingalsbe<Singalsbe@everettwa.gov> <br /> Sent:Tuesday,January 24, 2023 12:40 PM <br /> To: Engineering/Public Services (PW)<evteps@everettwa.gov>;Tony Trofimczuk <br /> <ttrofimczuk@mukilteowa.gov>;Thad Newport<TNewport@eve rettwa.gov>; Jessica Jarvi <br /> <J J a ry i @ eve rettwa.g ov> <br /> Subject: RE: [EXTERNAL] City of Mukilteo Park inside City Limits of Everett PW2212-005 <br /> [WARNING:THIS MESSAGE HAS COME FROM A SENDER OUTSIDE THE CITY OF MUKILTEO NETWORK,] <br /> Hello Tony, <br /> I'm the reviewer for Planning. Looks like a great project but I am not understanding the location of the <br /> tracks. The blue, green, and black all look the same distance on the sketch but the table shows different <br /> lengths.The black line is 400' in the table. I drew a 400-foot long line from approximately where the <br /> white box is on your sketch.This would put the disturbance of the track fairly close to the wetland. Can <br /> you provide a better sketch so I can understand how close the clearing will be to the wetland? <br />