My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF Consulting Engineers 1/18/2024 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
KPFF Consulting Engineers 1/18/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 10:26:29 AM
Creation date
1/19/2024 10:25:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF Consulting Engineers
Approval Date
1/18/2024
Council Approval Date
1/10/2024
End Date
12/31/2027
Department
Parks
Department Project Manager
Brad Chenoweth
Subject / Project Title
Later Phase Eclipse Mill Park Project & Riverfront Trail Improvement Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003149
Total Compensation
$513,752.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
KPFF Consulting Engineers 12/30/2021
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Consulting Engineers <br />1601 5th Avenue, Suite 1600, SEATTLE, WA 98101 P:206-622-5822 F:206-622-8130 WWW.KPFF.COM <br />P a g e 7 | 7 <br />B.Stone Column Inspection - A geotechnical engineer, from the consultant, will provide <br />full-time inspection of the installation of the stone columns. We envision stone column <br />installation will take a minimum of 10 full working days to complete. However, <br />potential equipment breakdowns and other factors are likely to lengthen the <br />construction period. We have assumed 12 days of full-time inspection as a <br />reasonable estimate. <br />C.Verification Testing Analysis and Reporting: The consultant shall review the before <br />and after verification test results to confirm that the stone column installation provided <br />the desired soil improvement. The results will be provided to the contractor and the <br />design team to verify the installation. <br />D.Pile Driving Submittal Review and WEAP Analysis: The Consultant will review the pile <br />driving submittal and conduct or review the WEAP analysis for the proposed piles and <br />hammer configuration. <br />E.Pile Driving Preconstruction Conference – The consultant shall attend one pile driving <br />preconstruction conference to go over details of the pile installation. <br />F.Pile Driving Inspection - A geotechnical engineer, from the consultant, will provide full- <br />time inspection of the installation of the Viewing platform and floating dock piles. We <br />envision pile installation will take a minimum of 12 full working days to complete. <br />However, potential equipment breakdowns and other factors are likely to lengthen the <br />construction period. We have assumed 15 days of full-time inspection as a <br />reasonable estimate. <br />Assumptions <br />Services to be provided subsequent to this task include: <br />•The Owner will provide seven (7) days advance notice for the material inspection. <br />•The Owner will prepare the meeting agenda and finalize the draft meeting notes and <br />distribute the meeting notes. <br />•The Owner’s inspector will direct the Contractor in all instances. <br />•Stone Column verification testing will be completed by the contractor. <br />Deliverables <br />Deliverables to be provided subsequent to this task include: <br />•Review and provide input on Contractor’s work plan and schedule. <br />•RFI Responses and log. <br />•Submittal Reviews and log. <br />•Change Order recommendations. <br />•Stone Column and Pile Driving Field reports. <br />•Final Letter accepting stone columns. <br />Management Contingency Reserve Fund <br />A contingency fund to address the need for additional design services that may arise during the <br />life of the project. The City will request written proposals for any additional services not covered <br />under this scope. No work shall commence without prior written authorization from the City for <br />such tasks.
The URL can be used to link to this page
Your browser does not support the video tag.