Laserfiche WebLink
OVER-THE-COUNTER BUILDING PERMIT CHECKLIST FOR RESIDENTIAL SOLAR <br /> PHOTOVOLTAIC SYSTEMS: ROOFTOP MOUNTED <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> in this Checklist.All project plans and supporting documentation must be provided on site for the inspector. <br /> TO BE COMPLETED BY APPLICANT <br /> 0 Project Information <br /> Property Owner Name: Barbara Knorr <br /> Project Address: 2214 7th St. Parcel# <br /> City: Everett State:WA ZIP:98201 <br /> Day Phone: 206-527-9449 <br /> Contractor Name A&R SOlar <br /> Contractor License#: RSOLAS*903JM <br /> Contractor Day Phone: 206-707-9937 <br /> PV system description Installing a 3.420kW Photovoltaic System on the roof. <br /> (include manufacturer (12) Itek Energy 285W <br /> and model#of PV (1) Solectria 3800TL <br /> modules and <br /> inverters): <br /> ©Determine if your project qualifies for expedited permitting: <br /> Yes No <br /> 1. PV system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that ❑ <br /> is code compliant to setbacks and height, or code allows expansion of nonconformity for <br /> solar modules. [IRC 101.2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by 111 ❑ <br /> the local jurisdiction. <br /> 3. Rooftop is made from lightweight material such as a single layer of composition shingles, ❑ <br /> metal roofing, lightweight masonry,or cedar shingles. <br /> 4. The installation shall comply with the manufacturer's instructions. [IRC M2302.2] Lij 0 <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code, and all <br /> required electrical permit(s) must be obtained from the Authority Having Jurisdiction to f ❑ <br /> administer the electrical code. [IRC M2302.2] <br /> 6. The installation shall meet the requirements of the International Fire Code as amended a ❑ <br /> by WA State. [IRC M2302.2] <br /> 7. The PV system is designed for the wind speed of the local area,and will be installed per ❑ <br /> the manufacturer's specifications. [IRC M23C2.2.1(1)] Ir I <br /> 8. The ground snow load does not exceed 70 pounds per square foot. [IRC M2302.2.1(2)] ✓ <br /> 9. Total dead load of modules,supports, mountings, raceways and all other appurtenances <br /> weigh no more than four pounds per square foot. [IRC M2302.2.1(3)] 0 <br /> Enter total dead load of system (lbs/ft2): 2.8 <br /> 10. To address uplift, modules are mounted no higher than 18"above the surface of the ❑ <br /> roofing to which they are affixed. [IRC M2302.2.1(4)] <br /> 1 <br />