Laserfiche WebLink
H. Improvements <br /> 1. Smooth Transition of lmproveunents <br /> All improvements required by this Ordinance shall be extended as necessary to <br /> provide a smooth transition with existing improvements, both laterally across <br /> the street and longitudinally up and down the street, for utilities and vehicular <br /> and pedestrian traffic. <br /> 2. Utility Improvement Plans <br /> All street and utility improvement plans shall be prepared by a State of <br /> Washington Licensed Civil Engineer. All plans shall be prepared on <br /> reproducible mylar material and presented to the City for approval. <br /> 3. Acceptance of Improvements <br /> The City Engineer is hereby authorized to accept all improvements and/or <br /> Right-of-Way dedication required in this Ordinance on behalf of the City. <br /> I. Survey <br /> 1. Survey Required for All Divisions, Redivisions, Alteration or Vacation of <br /> Land and Boundary Line Adjustment meeting the following minimum <br /> standards: <br /> a) A survey for division, redivision, alteration or vacation, and a boundary <br /> line adjustment must be conducted by or under the supervision of a <br /> registered land surveyor in the State of Washington. The surveyor shall <br /> certify on the final map that it is a true and correct representation of the <br /> lands actually surveyed and that the survey was done in accordance with <br /> City and State law. <br /> b) In all divisions of land and boundary line adjustments, lot corners must <br /> be set before final approval can be granted. <br /> c) In all divisions of land, perimeter monuments must be set before final <br /> approval can be granted. <br /> d) In all divisions of land, control monuments must be set before final <br /> acceptance of public improvements. Performance guarantees must <br /> include the installation of all control monuments. Control monuments <br /> must be installed per City Design and Construction Standards. <br /> e) In all divisions of land where final approval is to be granted by the <br /> acceptance of a performance guarantee, lot corner and perimeter <br /> monuments must be set. The performance guarantee must include the <br /> resetting of any monument that has been lost during construction of <br /> public improvements. <br /> f) Regarding all residential condominium Binding Site Plans where all lots <br /> are not to be shown: Prior to the recording of the Binding Site Plan, the <br /> 73 <br />