Laserfiche WebLink
it INSPECTION REPORT <br /> Date: 5) 1 1 Permit: <br /> 6-) lo 03-o . <br /> Contractor: cm6 I n V' <br /> evffirren wa,tetmq Pfyvi 1 --/— <br /> ow <br /> Site Address:OA DO 1'2)61 GlAit E/0 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground E Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> • _- g ❑Insulation ❑ Mechanical Final ❑Medical Gas <br /> Cei ng G .. ❑Drywall Nailing ❑Plumbing Final <br />' w'4 Electrical inal ❑Shear Nailing GAS PIPE <br /> SITE W•r ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> iii .•. ing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P RMIT <br /> 1 ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date: <br /> EIR(4/09) � c______,m7 FO S&PROMOTIONS•425/488-R91111 <br />