Laserfiche WebLink
1 <br /> .Miker, INSPECTION REPORT <br /> ig )- 62-0' Date: Permit: ` Un <br /> a Iii- <br /> Contractor: L412, <br /> Clu ' ' ` - ° 'A1 -�I�L <br /> Site Address: )-71)-71 ' I / 4 ` <br /> F INSPECTION REQUESTED <br /> ELECTRICAL BUILDI MECHANICAL PLUMBING <br /> ❑Temp Service R ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate Cl OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑ ding Grid CI Refrigeration ❑ Rough In <br /> II ❑Roof drains ilf ng Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR NSULTATION• <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMI <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date: / <br /> EIR 4/09 / <br /> FORMS&PROMOTIONS •413;188-8400 <br />