My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5900 36TH AVE W B SOUNDVIEW EVERETT 2024-08-09
>
Address Records
>
36TH AVE W
>
5900
>
SOUNDVIEW EVERETT
>
5900 36TH AVE W B SOUNDVIEW EVERETT 2024-08-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2024 3:56:27 PM
Creation date
1/31/2024 3:16:27 PM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
5900
Unit
B
Tenant Name
SOUNDVIEW EVERETT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
705
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LIGHTING COMPLIANCE SUMMARY A q1'111114 <br /> '. <br /> 2018 WSEC Compliance Forms for Commercial Buildings including Group R2,R3&R4 over 3 stories and all R1 Administered by:©2022 NEEA,All rights reserved <br /> Project Title Bridge Point Everett 500-Building B-2018 WSEC For Building Department Use: 'Date: Apr 13,2022 <br /> 5900 36th Ave West <br /> Project Address Building B <br /> Project&Applicant Everett,WA 98203 <br /> Information Applicant Name John Llacuna <br /> Applicant Phone 425-646-1818 <br /> Applicant Email john.11acuna@SynThesisPLLC.com <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> General Occupancy All Commercial General Building Use Type Warehouse,Distribution Building Cond.Floor Area 85,603 <br /> New Building or Project Cond.Floor Area 85,603 <br /> Interior Lighting Alteration <br /> General Project Types New Building Addition Exterior Lighting Lighting Scope Floors Above Grade 1 <br /> Lighting Scope Compliance Method Compliance Method 1-General <br /> Lighting Project Description New industrial building utilizing tilt-up construction,high bay fixtures for interior and exterior LED wall packs. <br /> Interior/Exterior LPA Calculation <br /> Project Type (Interior includes both interior&parking) Luminaire Replacement Scope Compliance Method Adjustment Compliance Verification <br /> Lighting Compliance Scope <br /> and Method New Building Interior Lighting Space by space Reduced lighting power density option COMPLIES <br /> New Building Exterior Lighting Not applicable to exterior COMPLIES <br /> Additional Efficiency Reduced lighting power density credit <br /> Options Included <br /> Proj ,, j Bridge Point Everett 500-Building B-2018 WSEC Date. Apr 13,2022 <br /> [ <br /> Lighting Power Calculation NEW BUILDING-INTERIOR LIGHTING Compliance Verification COMPLIES <br /> Compliance Method Space by space LPA Calculation Adjustment none <br /> Interior Lighting Power Allowance-Space by Space <br /> General Space Type Specific Space Type Ceiling Gross Interior Area(SF) LPA(Watts/SF) Total Watts Allowed Total Proposed Watts Compliance Status <br /> Height(Ft) (SF x LPA x 1) (LPD+Display LPD) <br /> Warehouse/storage area Medium to bulky palletized items 85,603 0.33 28,249 <br /> Proposed Total LPD 10782 <br /> Totals 28,249 10,782 COMPLIES flp <br /> Proposed Lighting Power Density <br /> Watts or Total Watts <br /> Fixture Type Fixture IDQuantity of Wattage Limit Total Linear Watts per Linear Proposed <br /> Fixtures(#F) per Fixture Feet(LF) Foot(WpLF) (#F x WpF)or <br /> (WPF) (LF x WpLF) <br /> Individual Fixtures <br /> Horizontal surface-mount Electrical and Sprinkler Rooms 6 22 132 <br /> Suspended High Bay LED 50 213 10,650 <br /> Proposed Total LPD 10782 <br /> Project Title Bridge Point Everett 500-Building B-2018 WSEC :Date Apr 13,2022 <br /> Proposed Fixtures Details NEW BUILDING-INTERIOR LIGHTING <br /> Fixture Type/Application Fixture ID Location in Documents Lamp Type Ness or <br /> Existing-to-Remain <br />
The URL can be used to link to this page
Your browser does not support the video tag.