Laserfiche WebLink
;4'roject.Title Bridge Point Everett 500-Building B-2018 WSEC ate 2022 <br /> SHGC x A Calculation NEW BUILDING-SEMI-HEATED COMPLIES <br /> Fenestration and Opaque Door Assemblies PROPOSED TARGET <br /> Glazed Doors-North Facing Assembly H) pF Glazed Door Rough Opening SHGC x A Glazed Doors Rough Opening SHGC x A <br /> SHGC (SF) SHGC <br /> Swinging entrance door Storefront Doors PF<0.2 0.038 144.0 S 5 0.51 141.6 72.2 <br /> (0.9834) <br /> Horizontal Assembly ID PF Skylight Rough Opening SHGC x A Skylight Rough Opening SHGC x A <br /> SHGC (SF) SHGC (SF) <br /> 1 <br /> 1,120.0 <br /> 392.0 <br /> Skylights Acrylic Triple Dome Skylight 0.350 1,120.0 , 392.0 0.35 (1) <br /> Fenestration Rough Opening Fenestration Rough Opening <br /> Vertical Fenestration-North Facing Assembly H) PF SHGC x A SHGC x A <br /> SHGC (SF) SHGC (S <br /> Fixed-Class AW or site built See A2.1,A2.2&A3.1-North Facing PF<0.2 0.380 2,086.0 ( 792 7 0.51 2051.4834) f,,� y9r <br /> ( .9 4 <br /> Vertical Fenestration-South/East/West Facing Assembly ID PF Fenestration Rough Opening SHGC x A Fenestration Rough Opening SHGC x A <br /> SHGC (SF) SHGC (SF) <br /> Fixed-Class AW or site built See A2.1,A2.2&A3.1 PF<0.2 0.380 1 1,254.0 s 476.5 0.38 1,23 <br /> 0 <br /> 34)_ <br /> Proposed Area Proposed SHGC x A I Target Area Target SHGC x A <br /> Project Totals i 4,604 1,667 4,567 2,006 6 <br /> o <br /> TARGET AREA ADJUSTING 0, <br /> • <br />