Laserfiche WebLink
N <br /> % <br /> 02 £ gym <br /> r <br /> I I <br /> 1,1111— <br /> IN <br /> ;2o—\ \\ \\ <br /> MESSENGER OF <br /> r / <br /> FAITH CHURCH / <br /> LU <br /> � II <br /> Al <br /> W <br /> I I A2 V <br /> W <br /> I <br /> A11 12 A9 A8 A7 A6 A3 \\ / \.� I V Z <br /> r i A / Q <br /> II --- ———— -- — 71 <br /> — ------�� `\\�/ LU <br /> ° W <br /> 1 rr=====ijl L---------------- -- 0 ° o / L�jJUj <br /> W---------------- ------------ <br /> 11 II I I <br /> ° / <br /> K64 IIII O m > <br /> LU <br /> o I \\ <br /> I ® J Q <br /> ° g Z <br /> E I ® o LU Q <br /> o o � <br /> 6' CHAIN LINK QZ <br /> N LU <br /> J o <br /> a <br /> 'a <br /> Q <br /> HAZARDOUS MATERIALS SITE PLAN <br /> GENERAL NOTES LEGEND <br /> E M 1/16"=V-0" 1. CONTRACTOR TO VERIFY ALL ITEMS SHOWN,LOCATIONS AND 4. PERFORM ALL ACTIVITIES IMPACTING ASBESTOS-CONTAINING <br /> QUANTITIES OF ASBESTOS-CONTAINING MATERIALS(ACMS), MATERIALS(ACM),LEAD-CONTAINING PAINT(LCP)AND LEAD APPROXIMATE RETAIL SPACE DIVISIONS o <br /> a AND DIMENSIONS PRIOR TO REMOVAL.ANY DEVIATIONS FROM COMPONENTS,PCB-CONTAINING LIGHT BALLASTS,AND <br /> THE SPECIFICATION THAT ARE DISCOVERED BY THE MERCURY-CONTAINING LIGHT TUBES IN ACCORDANCE WITH ® ASBESTOS-CONTAINING SHEET FLOORING <br /> CONTRACTOR SHALL BE REPORTED TO THE OWNERS SPECIFICATION SECTION 01 11 10 SUMMARY OF HAZARDOUS <br /> REPRESENTATIVE PRIOR TO REMOVAL. MATERIALS WORK,AND ALL APPLICABLE LOCAL,STATE,AND ASBESTOS-CONTAINING MASTIC BENEATH <br /> > FEDERAL REGULATIONS. NON-ASBESTOS 12"VINYL FLOOR TILE <br /> 2. REMOVAL OF HAZARDOUS MATERIALS MAY COMPROMISE THE e y <br /> SECURITY OF THE SITE.THE CONTRACTOR IS FULLY 5. PERFORM SELECTIVE DEMOLITION OF EXISTING WALL,FLOOR ABATEMENT NOTES .a w <br /> s RESPONSIBLE FOR MAINTAINING SITE SECURITY AND PUBLIC AND CEILING ASSEMBLIES OF VARYING TYPES AS NECESSARY 1. REMOVE APPROX.120 SF OF ASBESTOS-CONTAINING SHEET <br /> SAFETY THROUGHOUT THE PROJECT.SEE SPECIFICATIONS TO ACCESS CONCEALED MATERIALS. FLOORING AS INDICATED.SEE LEGEND FOR LOCATIONS. <br /> REGARDING SECURITY AND PUBLIC SAFETY. <br /> 6. BASED ON TESTING AND THE AGE OF THE BUILDING ALL 2. REMOVE APPROX.450 SF OF ASBESTOS-CONTAINING MASTIC <br /> 3. ABATEMENT CONTRACTOR TO COORDINATE ALL ACTIVITIES PAINTED COATINGS ARE CONSIDERED LEAD.PERFORM ALL BENEATH NON-ASBESTOS 12"VINYL FLOOR TILE AS <br /> WITH PRIME CONTRACTOR INCLUDING,BUT NOT LIMITED TO DEMOLITION ACTIVITIES IN ACCORDANCE WITH SPECIFICATION INDICATED.SEE LEGEND FOR LOCATIONS. <br /> 0 SCHEDULE,ACCESS,ELECTRICAULITILITY SHUTDOWNS AND SECTIONS 01 11 10,02 83 00 AND ALL APPLICABLE LOCAL,STATE, d <br /> a DEMOLITION.PERFORM SELECTIVE DEMOLITION AS NECESSARY AND FEDERAL REGULATIONS. Z <br /> 3. REMOVE APPROX.60 SF OF ASBESTOS-CONTAINING ASPHALTIC <br /> TO ACCESS CONCEALED HAZARDOUS AND/OR COATING FROM ROOF-LEVEL DUCTWORK(NOT SHOWN). DRAWN BY <br /> ASBESTOS-CONTAINING MATERIALS TO BE REMOVED. 7. ALL FLUORESCENT LAMPS ARE CONSIDERED KJB <br /> ABATEMENT CONTRACTOR TO REPORT LOCATIONS AND MERCURY-CONTAINING.IMPACT MERCURY-CONTAINING CHECKED: <br /> QUANTITIES OF ALL HAZARDOUS MATERIALS TO BE DEMOLISHED FLUORESCENT LAMPS IN ACCORDANCE WITH SPECIFICATION W TO <br /> TO THE OWNERS REPRESENTATIVE PRIOR TO SECTION 01 11 10,SUMMARY OF HAZARDOUS MATERIALS WORK, U DATE: <br /> 2020 <br /> a ABATEMENT/DEMOLITION. AND ALL APPLICABLE REGULATIONS AS NECESSARY TO Y PROJECT NUMBER: <br /> ACCOMPLISH WORK. U 40535.430 <br /> E Ljj <br /> SHEETID <br /> Full Size Sheet Format Is 30x42;If Printed Size Is Not 30x42,Then This Sheet Format Has Been Modified&Indicated Drawing Scale Is Not Accurate. U H M 1 <br />