Laserfiche WebLink
1 2 3 4 5 <br /> I I <br /> GENERAL DEMOLITION NOTES: <br /> m! 1 <br /> N 8 <br /> 1. RESIDENTIAL STRUCTURES AND FOUNDATIONS WITHIN THE DEMOLITION <br /> LIMITS HAVE BEEN REMOVED AND SERVICE UTILITIES CAPPED UNDER <br /> hm O� m BUILDING DEMOLITION PLANS. CONTRACTOR SHALL REVIEW ABATEMENT <br /> \ I AND DEMOLITION CONTRACT DOCUMENTS AND SCHEDULES TO ENSURE 1601 6[h Avenue,Suite 1600 <br /> \ 12 _ THE ABOVE WAS COMPLETED AS INDICATED OTHERWISE ANY Seattle,WA 98101 <br /> — <br /> _ REMNANTS WILL BECOME PART OF THIS DEMOLITION PLAN. <br /> 206.622.5822 <br /> CONTRACTOR SHALL COORDINATE THEIR DEMOLITION SCHEDULE www.kpff.com <br /> ACCORDINGLY. BELOW GRADE UTILITIES REMAINING ON THE PROJECT <br /> SITE AND SHALL BE DEMOLISHED, PER THESE NOTES. <br /> D ° 11C ALK 2. CONTRACTOR TO COORDINATE TREE PROTECTION WITH OWNER'S D <br /> REPRESENTATIVE. CONTRACTOR IS RESPONSIBLE FOR THE TREE <br /> PROTECTION AND THE HEALTH OF THE TREES FOR THE DURATION OF <br /> THE PROJECT. <br /> 4 REFER TO WATER UTILITY PLANS <br /> FOR RECONNECTION OF EXISTING 3. ALL EXISTING SURFACE FEATURES REMAINING WITHIN THE DEMOLITION <br /> I- q 3 e WATER MAIN PRIOR TO CAPPING LIMITS SHALL BE REMOVED IN THEIR ENTIRETY, UNLESS OTHERWISE <br /> 7 — AND DEMOLISHING EXISTING WATER NOTED. <br /> AP v "°"4< - MAIN PIPE THROUGHOUT THE SITE. <br /> i h 3 �ma I ''11�Fo °F1 1 4. ALL ASPHALT AND CONCRETE RUBBLE GENERATED BY DEMOLITION <br /> 5 I o o,=� \--- /s �` - _ ACTIVITIES SHALL BE REMOVED AND RECYCLED IN A LEGAL MANNER. <br /> - \ >, 5. ALL UTILITY STRUCTURES SHALL BE REMOVED FROM WITHIN THE <br /> o <br /> DEMOLITION LIMITS IF RIM TO INVERT IS 5 FEET OR LESS. FOR <br /> UTILITY STRUCTURES DEEPER THAN 5 FEET FROM RIM TO INVERT, <br /> OHL DEMOLISH AND REMOVE THE TOP 5 FEET OF THE STRUCTURE AND <br /> FILL WITH CDF, UNLESS OTHERWISE NOTED. ASSOCIATED PIPES SHALL <br /> BE CAPPED TO PREVENT THE MOVEMENT OF GROUNDWATER. <br /> A II zi"API Y'°"AP T,a �I I 5 3 III EXCAVATION SHALL BE BACKFILLED WITH COMPACTED STRUCTURAL 'JONAL ce�� <br /> 2OCONSTRUCTION FENCE q — I) IIII FILL. <br /> ( ) 03/30/2021 <br /> TYP <br /> o" - v I =. m <br /> _ 6. ALL WATER VALVES, POWER AND COMMUNICATION VAULTS HANDHOLES PROJECT: <br /> ODEMOLITION LIMITS - a 11 a.� b I �I av I 7 3 ENCOUNTERED WITHIN DEMOLITION LIMITS SHALL BE REMOVED AND <br /> (TYp) DISPOSED OFF-SITE IN A LEGAL MANNER. BAKER HEIGHTS LEGACY <br /> REMOVE EXISTING WATER <br /> i I s I� VAULT AND MASTER G 7. EXISTING UTILITY PIPES 8"0 AND GREATER INTERCEPTED BY C <br /> c o j -- METER AND RECONNECT 5 TRENCHING OPERATIONS SHALL BE GROUTED BOTH SIDES OF TRENCH EVERETT <br /> a 5 ;� EXISTING CITY TO PREVENT THE MOVEMENT OF GROUNDWATER. HOUSING AUTHORITY <br /> MAIN. REFER TO WATER <br /> I r I <br /> `II UTILITY PLAN. <br /> J <br /> a I I 8. ALL PRODUCTS OF DEMOLITION ACTIVITIES SHALL BE REMOVED AND <br /> DEMOLITION NOTES: ) 8 °II a vv - I I LEGALLY DISPOSED OF OFF-SITE. ASPHALT AND CONCRETE SHALL BE <br /> RECYCLED OFF-SITE. <br /> THIS DEMOLITION PLAN ANTICIPATES EXISTING BUILDING STRUCTURES HAVE BEEN ` `� -- PROJECTADDRESS: <br /> I I \ \ I 9. ALL UTILITIES AND ASSOCIATED STRUCTURES SHOWN TO REMAIN <br /> r I \ I I o l <br /> w 1I <br /> DEMOLISHED AND DEBRIS REMOVED OFF SITE; THEREFORE THE CONTRACTOR SHALL: m �rI <br /> REMOVE ALL EXISTING SURFACE IMPROVEMENTS AND UTILITIES WITHIN THE DEMOLITION "` ; III SHALL BE PROTECTED BY CONTRACTOR. ALL UTILITIES AND BUILDING A:271014th STREET <br /> u ) E v 11 STRUCTURES SHOWN TO BE DEMOLISHED/ABANDONED SHALL BE PER BUILDING B:272515th STREET <br /> LIMITS, UNLESS NOTED OTHERWISE. THE DEMOLITION LIMITS BOUNDARY IS AN ESTIMATE N_ n \ / RESPECTIVE UTILITY JURISDICTION REQUIREMENTS. BUILDING C:281515th STREET <br /> THAT EXPANDS FARTHER BASED ON SAWCUT LINE REQUIREMENTS FOR UTILITY BUILDING i I0 �I II <br /> v I I I I I I ( _ ) I I BUILDING D:281014th STREET <br /> INSTALLATIONS. THE CONTRACTOR SHALL FIELD VERIFY AND ACCOUNT IN THE BID I e it ' 10. A PERIMETER CHAIN LINK CONSTRUCTION FENCE WAS INSTALLED EVERETT,WA 98201 <br /> ACCORDINGLY. HAUL ALL DEMOLISHED MATERIALS OFFSITE IN A LEGAL MANNER. --I-IW1�L.= I d I - II DURING THE BUILDING DEMOLITION CONTRACT. DEMOLITION <br /> V A l A�� �' I I ) I II I OWNER: <br /> COORDINATE NTH THE OWNER AND THE ARCHITECT FOR ANY MATERIAL SALVAGE. — CONTRACTOR SHALL INHERIT THIS FENCE AND MAINTAIN IT THROUGH <br /> y i h� �I EVERETT HOUSING LEGACY LLLP <br /> O INSTALL MAINTAIN AND MODIFY TEMPORARY CONSTRUCTION FENCE AS NEEDED TO 1 ' ' ( THE CONSTRUCTION PERIOD AND ADD ANY ADDITIONAL FENCE AND <br /> i r M,I( 3107 COLBY AVENUE <br /> GATES AS NEEDED. CONTRACTOR TO LEAVE INSTALLED FENCING IN EVERETT,WA 98201 <br /> ACCOMMODATE PROJECT DEMOLITION AND CONSTRUCTION ACTIVITIES. I I °F , L� <br /> i _ � I I / � I r I � v v I III I I � I I GOOD WORKING CONDITION. TESC MEASURES SHALL BE REMOVED <br /> 3 PRIOR TO CAPPING UTILITY, VERIFY AND REROUTE ACTIVE EXISTING UTILITY SERVICES ,I _ g tr AFTER GROUND HAS BEEN STABILIZED, UNLESS NEEDED BY FURTHER <br /> 0 / °�� I i \ p OTEC EXISTING ) II I Iml f- i <br /> COMING FROM ADJACENT PROPERTIES TO ACCOMMODATE ALL EXCAVATION AND I I e1 8 `\ S EE LIGHT FOR to I CONSTRUCTION OR REQUIRED BY COE INSPECTOR. <br /> CONSTRUCTION ACTIVITIES. i AM ti ' R LO TIO / m w <br /> J ) I \I \I 11 ON 11. ALL UTILITY PIPES 8 INCHES OR GREATER IN DIAMETER AND LOCATED <br /> 4 PROTECT EXISTING STRUCTURE TO REMAIN IN SERVICE. PLUG INLETS PER CITY OF �° P a BELOW BUILDING AREAS MAY BE LEFT IN PLACE PROVIDED THEY ARE <br /> EVERETT REQUIREMENTS AS SHOWN IN PLAN. a. � "� FULLY GROUTED. ALL UTILITIES LESS THAN 8 INCHES IN DIAMETER <br /> AND LOCATED BENEATH BUILDING AREAS MAY BE LEFT IN PLACE <br /> 5 PROTECT AND MAINTAIN PORTIONS OF THE EXISTING STORM AND SEWER SYSTEMS FULLY PROVIDED THEY ARE CAPPED AND OR PLUGGED NTH GROUT. UTILITY <br /> OPERATIONAL UNTIL THE PROPOSED SYSTEMS OR TEMPORARY BYPASS SYSTEMS ARE I VIII I PIPES ENCOUNTERED OUTSIDE OF BUILDING AREAS DURING MARK DATE DESCRIPTION <br /> B INSTALLED. AFTER THE INSTALLED PROPOSED OR TEMPORARY BYPASS SYSTEMS ARE I I e5 - IY _ �I\I REDEVELOPMENT ACTIVITIES SHOULD BE PLUGGED, CAPPED, OR B REVISIONS <br /> FULLY OPERATIONAL, THE EXISTING STORM AND SEWERS SHALL BE TAKEN OFFLINE VA I ISI 11 I II IIII REMOVED TO PREVENT MOVEMENT OF GROUNDWATER. <br /> CAPPING AND PLUGGING OPERATIONS AND THEN THE EXISTING STORM AND SEWER ' <br /> SYSTEMS WITHIN THE PROJECT SITE SHALL BE DEMOLISHED, UNLESS NOTED OTHERWISE. r I / 12. ANY UTILITIES DISCOVERED DURING CONSTRUCTION OPERATIONS SHALL K nvnnmt cnNFORMFnsFT <br /> I s I I v v I h I r I <br /> vv o / IIII 6 �i <br /> © PROTECT EXISTING UTILITY SYSTEM PIPING TO REMAIN IN SERVICE. EXISTING UTILITY „ i III �=o III III o �I BE REMOVED TO A POINT, 3 FEET BELOW FINISH GRADE. THE UTILITY nvt�nmt AnnFNDIIMss <br /> ¢A m <br /> on= � I II SHALL BE CAPPED OR PLUGGED WITH GROUT TO PREVENT THE <br /> SYSTEMS INCLUDE GAS, SEWER, WATER AND STORM WATER. - 5 H 19I77Ylmn AnnFNnIIM@1 <br /> I e: I ��_ � I x IIII / III 11 I Ir MOVEMENT OF GROUNDWATER. ABANDONED UTILITY LINES UNDER <br /> PROPOSED BUILDINGS SHOULD BE IDENTIFIED DURING CONSTRUCTION O lmlwmmf) AnnFNrnlM0 <br /> 7O PROTECT EXISTING FIRE HYDRANT(S) UNTIL PROPOSED FIRE HYDRANTS ARE OPERATIONAL. x II N` T.a. AND EXISTING TRENCH BACKFILL SHOULD BE REMOVED AND REPLACED F nv�Rmm� f.ONSTRII.TION SFT nnFNOIIM$ <br /> �1 A ) <br /> THEN REMOVE EXISTING FIRE HYDRANTS AND CAP AT THE PRIVATE MAIN. v � 6 "° v PER RECOMMENDATIONS OF THE GEOTECHNICAL REPORT. <br /> r \ 5 4 \ 5 \ 5 j F 0419FI909° PERMIT CORRECTIONS <br /> ' ® COORDINATE THE REMOVAL OF EXISTING OVERHEAD POWER LINES, POWER POLES AND /'� �sz v �' i I Iv`� o� 5 13. CONTRACTOR IS RESPONSIBLE FOR CONTINUED OPERATION OF n 001120f) RID SFT <br /> STREET LIGHTS WITH THE SNOHOMISH COUNTY PUD AND WITH RESPECTIVE UTILITY o p v s -0' ' /J �, ti ) <br /> \a 3" \ \ o m t° EXISTING c mm �G AND TEMPORARY STORM SYSTEMS. CONTRACTOR SHALL namRIIIInINGPFRMITSORMITTAII <br /> PURVEYORS FOR ALL OTHER OVERHEAD CABLES.. <br /> I 4 I �\\ � I / III \ \ , / � \ \ i I REVIEW AND FIELD VERIFY THAT THE REMAINING PORTIONS OF THE HUD SUBMITTAL <br /> EXISTING STORM DRAINAGE SYSTEM WITHIN THE RIGHT OF WAY, <br /> I l 1 <br /> € 4 TEMPORARY STORM MEASURES AND PROPOSED GRADING ARE NOT IN B 041102020 DESIGN DEVELOPMENT <br /> RAGS/NEWSPAPER/DEBRIS TO PREVENT 2020 SCHEMATIC DESIGN <br /> i CONFLICT. WHERE CONFLICTS OCCUR, CONTRACTOR SHALL PROVIDE A 011°7 <br /> CONCRETE PLUG FROM SEEPING INTO EXISTING i memo ,/�' ,' r ��,� /I TEMPORARY PUMPING OR ALTERNATIVE SYSTEMS. MARK DATE DESCRIPTION <br /> SEWER SYSTEM REMAINING IN SERVICE <br /> �I6 \ o�7 ° ISSUE INFORMATION <br /> 6"CONCRETE PLUG /"a"oz. r m 13tH\ ST \\ \ ` \ 14. CONTRACTOR SHALL PREPARE A COLOR CODED RECORD PLAN NOTING <br /> / " I+�i �dll�h �' V A V I \ V I V A V 1 \ <br /> CAPS PLUGGED/ABANDONED/REMOVED UTILITIES FOR USE BY THE SITE <br /> DEVELOPMENT AND BUILDING CONTRACTOR'S TO COORDINATE, PLAN, 1700658 <br /> �l' ( " PROJECT NO.: <br /> :''rN SEWER MAIN TOO °a"FE"IFP ` AND SCHEDULE THEIR CONSTRUCTION EFFORTS ACCORDINGLY. GGLOPRINCIPAL INCHARGE: ACC <br /> REMAIN IN SERVICE w " „ <br /> l ( l tl l ( ( / i / GGLO PROJECT MANAGER: LE ig <br /> 1 AWCUo„(Twu"u Fc"cE ) ` A \ \ OWNER APPROVAL: <br /> O EXISTING SANITARY SEWER MAIN —m °„„ m= 011 ¢"A„L�i \ o <br /> A TO REMAIN IN SERVICE SHALL BE _ ��—A N A <br /> PROTECTED THROUGHOUT �„ m-- <br /> DURATION OF THE PROJECT. RAGS/NEWSPAPER/DEBRIS TO PREVENT I. N SHEET TITLE <br /> THE REMAINING SEWER MAIN CONCRETE PLUG FROM SEEPING INTO EXISTING c? SITE DEMOLITION <br /> SHALL BE CLEANED AND SEWER SYSTEM REMAINING IN SERVICE �T <br /> RETROFITTED PER THE SANITARY ;,, 6” CONCRETE PLUG 1V W <br /> SEWER PLANS. <br /> ' GAP LU SHEET NO. <br /> N <br /> CAP & PLUG DETAIL o <br /> FOR SANITARY SEWER SYSTEM 0 15 30 60 z C'2�0 <br /> O <br /> NTS <br /> 1 inch=30 feet U Awa, <br /> ""rg2MaNLL SHEETSQEISM1b <br /> 1 2 3 4 5 <br />