My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1919 112TH ST SW 2024-02-28
>
Address Records
>
112TH ST SW
>
1919
>
1919 112TH ST SW 2024-02-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 9:15:46 AM
Creation date
2/1/2024 11:44:14 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SW
Street Number
1919
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: Steve Banks <br /> Sent: Tuesday, May 25, 20214:33 PM <br /> To: Aaron McMullen <br /> Subject: RE: Everett Care Center <br /> Hi Aaron, <br /> I have received your plans for review and do not see any of the changes from the first set of plans in <br /> response to the correction letter sent out on January 21st 2021. Please see the email in this string dated <br /> May 5t" 2021 which says in part <br /> "I do not think that this new set of plans encompasses all of the work that was done. Permit E1910-184 <br /> has a description of work of"ALTER CIRCUITS- (7) FROM ESO TO ESA" . I do not see a before and after <br /> load calculation and one line for all of those effected panels. I also still see the generator listed as a 100 <br /> kw which does not appear to have enough capacity for the calculated load. Perhaps this generator is not <br /> labeled properly. Please make sure you address the correction letter sent to Aaron McMullen dated 1- <br /> 21-21 for the above permit." <br /> These plans do not include any information for panel ESO that is in the description of work as being <br /> altered. <br /> Thank you, <br /> - Steve Banks <br /> Electrical Inspector I Permit Services <br /> 425.257.8810 1 3200 Cedar Street, 2nd Floor, Everett, WA 98201 <br /> EVERETT eve rettwa.gov permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant <br /> to the Public Records Act. <br /> From: Aaron McMullen <aaron@abacuselectricllc.com> <br /> Sent: Monday, May 24, 20211:32 PM <br /> To: Ryan Hammer<RHammer@everettwa.gov>; Steve Banks<SBanks@everettwa.gov> <br /> Cc:Adrian M. Steik<amsteik@safeconsulting.biz> <br /> Subject: RE: Everett Care Center <br /> We can schedule that inspection for ANYTIME. The District maintenance director is CC'd in this email <br /> and the on-site maintenance person is on site between 0800 and 3:00 typically. <br /> From: Ryan Hammer<RHammer@everettwa.gov> <br /> Sent: Monday, May 24, 20211:30 PM <br /> To:Aaron McMullen <aaron@abacuselectricllc.com>; Steve Banks<SBanks@everettwa.gov> <br /> Cc:Adrian M. Steik<amsteik@safeconsulting.biz> <br /> Subject: RE: Everett Care Center <br /> Hi Steve, <br />
The URL can be used to link to this page
Your browser does not support the video tag.