My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell 2/1/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell 2/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 2:11:04 PM
Creation date
2/1/2024 2:10:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell
Approval Date
2/1/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Owner Advisor Services for the Water Filtration Plant Phase 2 progressive design build project
Tracking Number
0004163
Total Compensation
$22,532.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Document approved by Tim Benedict (TBenedict@everettwa.gov) <br />Approval Date: 2024-01-31 - 0:31:39 AM GMT - Time Source: server <br />Document emailed to Cassie Franklin (cfranklin@everettwa.gov) for signature <br />2024-01-31 - 0:31:40 AM GMT <br />Email viewed by Cassie Franklin (cfranklin@everettwa.gov) <br />2024-02-01 - 1:33:31 AM GMT <br />Document e-signed by Cassie Franklin (cfranklin@everettwa.gov) <br />Signature Date: 2024-02-01 - 1:33:43 AM GMT - Time Source: server <br />Document emailed to Marista Jorve (mjorve@everettwa.gov) for signature <br />2024-02-01 - 1:33:44 AM GMT <br />Document e-signed by Marista Jorve (mjorve@everettwa.gov) <br />Signature Date: 2024-02-01 - 6:13:59 PM GMT - Time Source: server <br />Agreement completed. <br />2024-02-01 - 6:13:59 PM GMT
The URL can be used to link to this page
Your browser does not support the video tag.