My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington State Military Department 1/31/2024
>
Contracts
>
6 Years Then Destroy
>
2024
>
Washington State Military Department 1/31/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 2:14:12 PM
Creation date
2/1/2024 2:12:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington State Military Department
Approval Date
1/31/2024
End Date
9/30/2024
Department
Office of Emergency Management
Department Project Manager
Jim Sande
Subject / Project Title
Emergency Management Performance Grant (E24-278)
Tracking Number
0004164
Total Compensation
$64,422.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
DHS-FEMA-EMPG-FY23 Page 44 of 44 Everett, E24-278 <br />Attachment G <br /> <br />BUILD AMERICA, BUY AMERICA ACT SELF-CERTIFICATION <br /> <br />The undersigned certifies, to the best of their knowledge and belief, that: <br /> <br />The Build America, Buy America Act (BABAA) requires that no federal financial assistance for “infrastructure” <br />projects is provided “unless all of the iron, steel, manufactured products, and construction materials used in the <br />project are produced in the United States.” Section 70914 of Public Law No. 117-58, §§ 70901-52. <br /> <br />The undersigned certifies that for the Insert Project Name and Location that the iron, steel, manufactured <br />products, and construction materials used in this contract are in full compliance with the BABAA requirements <br />including: <br /> <br />1. All iron and steel used in the project are produced in the United States. This means all manufacturing <br />processes, from the initial melting stage through the application of coatings, occurred in the United States. <br />2. All manufactured products purchased with FEMA financial assistance must be produced in the United <br />States. For a manufactured product to be considered produced in the United States, the cost of the <br />components of the manufactured product that are mined, produced, or manufactured in the United States <br />is greater than 55% of the total cost of all components of the manufactured product, unless another <br />standard for determining the minimum amount of domestic content of the manufactured product has been <br />established under applicable law or regulation. <br />3. All construction materials are manufactured in the United States. This means that all manufacturing <br />processes for the construction material occurred in the United States. <br /> <br />“The [Contractor or Subcontractor], ____________________, certifies or affirms the truthfulness and accuracy <br />of each statement of its certification and disclosure, if any. In addition, the [Contractor or Subcontractor] <br />understands and agrees that the provisions of 31 U.S.C. Chap. 38, Administrative Remedies for False Claims <br />and Statements, apply to this certification and disclosure, if any.” <br /> <br /> _______________________________________________________ <br />Signature of [Contractor’s or Subcontractor’s] Authorized Official <br /> Enter Name and Title <br />Name and Title of [Contractor’s or Subcontractor’s] Authorized Official <br /> <br /> <br />Date <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.