Laserfiche WebLink
<br /> <br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: Award and Authorize the Mayor to Sign Professional Services Agreement for Request for Qualifications <br />#2023-093 Everett Station HVAC Controls Replacement and Maintenance with Hultz BHU Engineers <br />Council Bill # interoffice use <br /> <br />Project: Everett Station HVAC Controls Replacement and Maintenance <br />Partner/Supplier: Hultz BHU Engineers <br /> Location: Everett Station <br />Preceding action: <br />Fund: 425 Transportation Services <br />Agenda dates requested: <br />January 31, 2024 <br /> <br />Briefing <br />Proposed action <br />Consent X <br />Action <br />Ordinance <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />Contract <br /> <br />Department(s) involved: <br />Procurement and Transit <br /> <br />Contact person: <br />Theresa Bauccio-Teschlog <br /> <br />Phone number: <br />(425) 257-8901 <br /> <br />Email: <br />tbauccio@everettwa.gov <br />Initialed by: <br /> sh <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />Everett Transit has been awarded a Federal Transit Administration grant in the amount of <br />$1,195,009 with a twenty percent (20%) $298,753 cash match for a total of $1,493,762. <br />PSA Hultz BHU Engineers Design $194,090 <br />Construction $1,299,672 <br />Total Budget $1,493,762 <br /> <br />Project summary statement: <br />Qualifications were requested from design firms to design, engineer, permit, and provide <br />construction documents and construction management to replace the existing Alerton DDC <br />systems serving Everett Station to reduce system energy use, increase system reliability, <br />improve occupant health and comfort, and replace equipment with connected wireless <br />thermostats and controls. <br />The design will include a review of current maintenance records and a plan to address any <br />deferred maintenance, repair, and replacement of bathroom exhausts throughout the <br />building, installation of destratification fans in the Great Hall, design of a new stand-alone <br />HVAC system for the server/computer room, and a complete balancing and recommissioning <br />of all systems. Everett Transit will use the construction documents to bid the HVAC control <br />replacement. <br />The Request for Qualifications was released on September 28, 2023. Companies from both <br />the Municipal Research Services Center (MRSC) roster and the Office of Minority and <br />Women's Business Enterprises (OMWBE) directory were directly notified about the <br />opportunity. On October 26, 2023, five responses were received. Staff is requesting an <br />award to Hultz BHU Engineers, who were determined to be the most qualified to complete <br />the design documents. <br />Supplier Name Score out of 100 Points <br />Hultz BHU 96 <br />P2S Engineering 81 <br />BCE Engineers 69 <br />Hargis Consulting Engineering 94 <br />Design West Engineering 53 <br />Recommendation (exact action requested of Council): <br />Award and authorize the Mayor to sign a Professional Services Agreement for Request for <br />Qualifications #2023-093 Everett Station HVAC Controls Replacement and Maintenance with <br />Hultz BHU Engineers in the amount not to exceed $194,090. <br /> <br />