Laserfiche WebLink
CITY OF EVERETT <br /> EVERETT OFFICE USE ONLY <br /> WASHINGTON Permit Services Transmittal Date Received Stamp <br /> PERM IT/PROJ ECT#: B2310-0329 lr?r'�—, '1) <br /> SITE ADDRESS: 9502 18TH Ave W Unit K OCT 2 3 2023 <br /> PROJECT NAME: Harrison Pointe CITY OF EVERETT <br /> FROM: Rhonda Clancy COMPANY:Pacific Ridqe Homes-DRH ❑Chronology—Permit Counter ransmittal <br /> PHONE#: 425.939A 164 ❑Plan Review Routing <br /> EMAIL: RLClancy(cr�drhorton com <br /> Location: []File []Reviewer Office <br /> Date Logged: By_ <br /> PE31 <br /> Check all that apply) Name of Reviewer Type of Review <br /> g Reviewer Name:Dennis Osborn Re-Review <br /> Works Reviewer Name: ❑ Revisions After Approval <br /> g Reviewer Name: ❑ Revisions After Issuance <br /> Reviewer Name: ❑ Other <br /> Reviewer Name: ❑Other <br /> Provide quantities for all items submitted <br /> PLANS REPORTS/CALCULATIONS OTHER DOCUMENTS <br /> Qty Qty <br /> Qty <br /> Architectural/Building Plans _ Geotechnical Report Correction Letter Responses <br /> Structural Plans _ Drainage Report _ Draft Easement <br /> — Civil Plans _ SWPPP Report _ Recorded Easement <br /> Site Plan _ Wetland Report _ Height Survey <br /> Landscape Plan _ Critical Area Report _ Base Elevation Survey <br /> Survey Traffic Stud TDM Report _ <br /> — Y/ P Critical Area Covenant <br /> Elevations _ Structural Calculations _ Stormwater Covenant <br /> Floor Plans _ Height Calculations _ Covenant-Other <br /> Special Inspection Report _ Plumbing Calculations _ Performance Guarantee <br /> As-Builts _ Other _ Warranty Bond <br /> Plat Maps _ Other _ Other <br /> Original City Redlines Returned _ Other _ Other <br /> Other Other <br /> — _ Other <br /> Other _ Other Other <br /> Items submitted are: <br /> ❑Complete Plan Set Replacement Q✓ Additional Documents <br /> (Slip-sheeting not permitted) (To be added to file) <br /> Comments to Reviewer: FOR CHANGES IN SCOPE: <br /> Updated addresses, added elevations, Revised Description of Work: <br /> updated max allowed elevation,added <br /> hightest point of sidewalk, added <br /> FFE+SG+0.5'+FFE Elev, added actual elev <br /> each unit, added,struc. height each unit Revised Valuation: <br /> Signed: Date: 10.20.2023 <br />