My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 24 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 72 00 - 24 GENERAL CONDITIONS <br />5.8. ACCEPTANCE OF WORK <br />Upon completion of the Project, including, but not limited to, record drawings, as-builts, required reports <br />and operations and maintenance manuals, the Contractor shall so notify the Owner’s Representative in <br />writing. Upon receipt of the notification, the Owner’s Representative will promptly, by personal <br />inspection, determine the actual status of the Work in accordance with the terms of the Contract. If the <br />Owner’s Representative finds materials, Equipment, or workmanship that do not meet the terms of the <br />Contract, he or she will prepare a Punch List of such items and submit it to the Contractor. Following <br />completion of the corrective Work by the Contractor, the Owner’s Representative will notify the Owner <br />that the Work has been completed in accordance with the Contract. The Owner shall make the final <br />determination of acceptability and completion. For portions of the Project not previously accepted as <br />substantially complete, the conditions of guarantee shall commence on the date that the Owner determines <br />the Project is complete. <br />6. CHANGES <br />6.1 OWNER’S RIGHT TO DIRECT CHANGES TO THE WORK <br />The Owner reserves the right to change the Work at any time. Such changes shall not invalidate the <br />Contract nor release the surety, and the Contractor agrees to perform the Work as changed. Among <br />others, these changes and alterations may include: <br />1. Deleting or omit any part of the Work, Equipment or material to be provided under this Contract, <br />and <br />2. Increasing or decreasing quantities, <br />3. Altering Specifications, designs, or both, <br />4. Altering the way the Work is to be done, <br />5. Adding new Work or Extra Work, <br />6. Altering facilities, Equipment, materials, services, or sites, provided by the Owner, and <br />7. Ordering the Contractor to accelerate or Delay Work. <br />If the Contractor and Owner do not agree upon scope of Work changed or adjustment to the Contract Sum <br />and Contract Time, the Owner may, at its sole option, unilaterally direct the Contractor to implement any <br />change by notice. The Owner shall not pay or be responsible or liable for any change implemented by the <br />Contractor without explicit notice from the Owner to proceed. <br />6.2 EXTRA WORK <br />At its sole option, the Owner may (1) perform Extra Work itself, (2) employ others to do it, (3) direct the <br />Contractor to perform the Extra Work at existing unit bid price, (4) direct the Contractor to perform the <br />Extra Work at a mutually agreed upon price, or (5) direct the Contractor to perform the Extra Work on a <br />Force Account basis. <br />6.3 CHANGE ORDERS <br />Changes to the Work may result in an increase or decrease in Contract Sum, as provided in 9.2. <br />PAYMENT FOR CHANGES. Requests for an increase in Contract Time must be made as provided in <br />5.2.2.2 Extensions of Contract Time, as applicable. Substantial changes in Contract Time, Contract <br />Sum or Work will often be negotiated and agreed between the Contractor and Owner before the Owner <br />directs the Contractor to proceed with the change.
The URL can be used to link to this page
Your browser does not support the video tag.