My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 30 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 72 00 - 30 GENERAL CONDITIONS <br />If the Contract Documents, laws, ordinances, or any public regulatory authority requires parts of the Work <br />to be specially inspected, tested, or approved, the Contractor shall give the Owner’s Representative <br />adequate prior written Notice of the availability of the subject Work for examination, which Notice shall <br />be not less than two (2) working days. <br />Inspection and quality control tests performed on Work by the Contractor by the Owner’s Representative <br />shall not relieve the Contractor of its responsibility for errors or lack of quality therein and shall not be <br />regarded as an assumption of risks or liability by the Owner’s Representative for the Contractor's <br />compliance with these Contract Documents. Contractor remains responsible and liable for all errors, <br />defects or a lack of quality not discovered by inspection or observation. <br />If parts of the Work are covered prior to inspection or observation, the cost of exposing the Work for <br />inspection and closing and re-covering shall be borne by the Contractor regardless of whether the Work is <br />found to be in compliance with the Contract. <br />8.6.2. Samples of Materials <br />The Contractor shall provide Samples or specimens of materials to be incorporated in the Work that <br />require laboratory examination or special testing, as requested by the Owner’s Representative. Such <br />Samples or specimens shall be provided in ample time to permit making proper test analysis and <br />examinations before the Contractor plans to incorporate the material into the Work. An independent <br />testing laboratory will conduct tests of material in accordance with the Specifications. In the absence of a <br />specific test requirement, the Owner’s Representative will determine the appropriate standard test to be <br />used. <br />8.6.3. Certification <br />In cases where compliance of materials or Equipment to Contract requirements is not readily <br />determinable through inspection and tests, the Contractor shall provide properly authenticated documents, <br />certificates, or other proof satisfactory to the Owner’s Representative that the materials and Equipment <br />comply with the Contract requirements. These documents, certifications, and proofs shall include <br />performance characteristics, construction materials, and physical or chemical characteristics of materials. <br />The Contractor shall pay all associated costs of such certification. <br />8.6.4. Inspection at Point of Manufacturing <br />The Contractor shall be responsible and reimburse the Owner for the costs of inspections occurring <br />outside of Whatcom, Skagit, Island, Snohomish, King, Pierce and Thurston counties if (a) inspection and <br />testing of materials or Equipment in the vicinity of the Work by the Owner is not practicable, (b) the <br />Contractor requests the Owner to inspect and test material or Equipment at the point of manufacture, or <br />(c) the Specifications require that inspection, testing or witnessing of tests take place at the point of <br />manufacture. Costs to be paid or reimbursed by the Contractor include, but are not limited to, travel, <br />subsistence, labor and lodging expenses of the Owner’s inspector. <br />8.6.5. Testing and Commissioning of Completed Work <br />Testing and commissioning of all mechanical, electrical, and instrumentation systems and completed <br />portions of the Work, functioning as a completed system and the complete Project, functioning as a <br />completed facility, shall be done in accordance with the Specifications. <br />8.6.6. Storage of Materials and Equipment <br />Contractor shall store materials and Equipment so as to insure the preservation of their quality and fitness <br />for the Work. Stored Equipment and materials shall be located so as to facilitate inspection. The <br />Contractor shall be responsible for damages, loss or casualty occurring to materials and Equipment until <br />Final Acceptance.
The URL can be used to link to this page
Your browser does not support the video tag.