My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 44 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 72 00 - 44 GENERAL CONDITIONS <br />2. The Contractor knows, or should with the reasonable exercise of ordinary care know, of a <br />differing site condition as provided in 11. DIFFERING SITE CONDITIONS; <br />3. The Contractor knows, or should with the reasonable exercise of ordinary care know, of any <br />Delay or an event that may cause a Delay; <br />4. The Contractor believes, or with the reasonable exercise of ordinary care should believe, it is <br />entitled to an adjustment of Contract Sum or Time, even if the total or exact amount or impact <br />cannot yet be determined; <br />5. The Contractor believes it is required or directed to perform work that is outside the scope of the <br />Contract Documents; or <br />6. An event occurs, or fails to occur, that the Contractor believes, or should reasonably foresee, may <br />result in a Contract Claim; <br />the Contractor shall immediately give Notice to the Owner or Owner’s Representative as provided in this <br />section and elsewhere in the General Conditions and Specifications. <br />Timely and adequate Notice is a condition precedent to a Contract Claim. <br />Requests for extensions of Contract Time must be made and will be evaluated in accordance with 5.2.2.2 <br />Extensions of Contract Time. <br />Irrespective of any request for additional compensation or Contract Time or any Contract Claim that work <br />is extra and not part of the original scope of Work, the Contractor shall proceed expeditiously and <br />promptly with the work as the Owner orders. <br />If the Contractor fails to follow the procedures of this Contract, including failing to give Notice, the <br />Contractor completely waives such Contract Claim. In its sole discretion, the Owner may waive strict <br />compliance with procedures, but any such waiver of one or more items or elements does not waive the <br />necessity for Contractor’s strict compliance with any other item or element, nor shall such waiver be <br />admissible in any legal proceeding for any reason. <br />10.2 FORM OF NOTICE <br />The Notice must include the following minimum information: <br />1. A complete and accurate description of the event or events giving rise to the Notice, including <br />dates, times, and locations; <br />2. A preliminary list of persons of involved in such event; <br />3. A statement whether the Contractor believes the event may result in a Contract Claim for <br />additional Contract Time or adjustment of the Contract Sum; <br />4. A date by which Contractor shall begin providing Supplemental Information as provided in this <br />section. <br />10.3 SUPPLEMENTAL INFORMATION <br />Contractor shall supplement the written Notice as soon as possible with a written statement providing the <br />following: <br />1. The date of the event, incident, direction, and other pertinent information; <br />2. The nature and circumstances giving rise to the Notice; <br />3. The Contract provisions relating to, but not limited to, the event, incident, and direction; <br />4. The estimated dollar cost, if any, of the Extra Work, or Delay, or both and how that estimate was <br />determined; and <br />5. An analysis of the schedule showing the schedule change or disruption if the Contractor is <br />asserting a schedule change or disruption.
The URL can be used to link to this page
Your browser does not support the video tag.